Construction Stormwater Program Management, Tracking, Reporting, and Compliance (2025)

Chapter: Appendix D: Oklahoma DOT Clean Water Inspection Form

Previous Chapter: Appendix C: Case Examples Questionnaire
Suggested Citation: "Appendix D: Oklahoma DOT Clean Water Inspection Form." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Suggested Citation: "Appendix D: Oklahoma DOT Clean Water Inspection Form." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
The Oklahoma Clean Water Inspection Form contains the Oklahoma D O T logo and title at the top, with fields to enter date, job piece, project number, contract I D, location description, R E and or O D O T contact, and type of inspection. The form provides checklists with yes, no, and not applicable options for multiple checks, which are grouped into categories: erosion minimization, sediment discharge minimization, best management practice maintenance, solid and hazardous waste, documentation and S W P P P, stabilization, and additional information. Each checklist has space for comments. At the bottom, a certification statement affirms the accuracy of the inspection, followed by spaces for the inspector name and signature, reviewer name and signature, and reviewer comments. A note at the bottom reads: The items in this inspection form align with the commitments of the O K R 10. The most recent iteration of this permit, along with supporting documents, can be found through the Q R code at the top.
Suggested Citation: "Appendix D: Oklahoma DOT Clean Water Inspection Form." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
The Oklahoma Clean Water Inspection Form contains the Oklahoma D O T logo and title at the top, with fields to enter date, job piece, project number, contract I D, location description, R E and or O D O T contact, and type of inspection. The form provides checklists with yes, no, and not applicable options for multiple checks, which are grouped into categories: erosion minimization, sediment discharge minimization, best management practice maintenance, solid and hazardous waste, documentation and S W P P P, stabilization, and additional information. Each checklist has space for comments. At the bottom, a certification statement affirms the accuracy of the inspection, followed by spaces for the inspector name and signature, reviewer name and signature, and reviewer comments. A note at the bottom reads: The items in this inspection form align with the commitments of the O K R 10. The most recent iteration of this permit, along with supporting documents, can be found through the Q R code at the top.
Suggested Citation: "Appendix D: Oklahoma DOT Clean Water Inspection Form." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
The Oklahoma Clean Water Inspection Form contains the Oklahoma D O T logo and title at the top, with fields to enter date, job piece, project number, contract I D, location description, R E and or O D O T contact, and type of inspection. The form provides checklists with yes, no, and not applicable options for multiple checks, which are grouped into categories: erosion minimization, sediment discharge minimization, best management practice maintenance, solid and hazardous waste, documentation and S W P P P, stabilization, and additional information. Each checklist has space for comments. At the bottom, a certification statement affirms the accuracy of the inspection, followed by spaces for the inspector name and signature, reviewer name and signature, and reviewer comments. A note at the bottom reads: The items in this inspection form align with the commitments of the O K R 10. The most recent iteration of this permit, along with supporting documents, can be found through the Q R code at the top.
Suggested Citation: "Appendix D: Oklahoma DOT Clean Water Inspection Form." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 142
Suggested Citation: "Appendix D: Oklahoma DOT Clean Water Inspection Form." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 143
Suggested Citation: "Appendix D: Oklahoma DOT Clean Water Inspection Form." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 144
Suggested Citation: "Appendix D: Oklahoma DOT Clean Water Inspection Form." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 145
Next Chapter: Appendix E: West Virginia DOT Division of Highways Environmental Construction Inspection Form
Subscribe to Email from the National Academies
Keep up with all of the activities, publications, and events by subscribing to free updates by email.