Construction Stormwater Program Management, Tracking, Reporting, and Compliance (2025)

Chapter: Appendix B: Individual Survey Responses

Previous Chapter: Appendix A: Survey Questionnaire
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
No Question 1&2: Please provide your state department of transportation (DOT) and consent to the survey.
1 Alabama
2 Alaska
3 Arizona
4 Arkansas
5 California
6 Colorado
7 Connecticut
8 Delaware
9 Florida
10 Georgia
11 Hawaii
12 Idaho
13 Illinois
14 Indiana
15 Iowa
16 Kansas
17 Maine
18 Maryland
19 Massachusetts
20 Michigan
21 Minnesota
22 Mississippi
23 Missouri
24 Nebraska
25 Nevada
26 New Hampshire
27 New Jersey
28 New Mexico
29 New York
30 North Carolina
31 North Dakota
32 Ohio
33 Oklahoma
34 Pennsylvania
35 Rhode Island
36 South Dakota
37 Texas
38 Utah
39 Vermont
40 Virginia
41 West Virginia
42 Wisconsin
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 3: What group/division do you primarily work in?
State DOT Construction Stormwater Management/Drainage Environment Design/Engineering Permitting
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 18 5 14 4 1
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 4: How is construction stormwater management handled at your DOT?
State DOT O1 O2 O3
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 11 25 6
O1. Formal construction stormwater management program, separate from project management
O2. Construction stormwater management is part of the project management process
O3. Both options above are used depending on the project scope and size
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 5: What division(s)/department(s) within your DOT is/are involved in the construction stormwater management program? (Select all that apply)
State DOT O1 O2 O3 O4 O5 O6 07 08 09 Other
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New
Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wyoming
TOTAL 41 23 35 10 31 18 13 7 8 1
KEY:
O1. Construction
O2. Stormwater Management/Drainage
O3. Environment
O4. Landscape Design
O5. Design/Engineering
O6. Maintenance/Operations
O7. Permitting
O8. Materials
O9. Policy and Regulations
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.

Other:

  • Designers show erosion and sedimentation controls (ESCs) on design plans. Contractors will put those controls out on site, or make modifications as necessary during construction. Environmental and Construction staff may be contacted to troubleshoot issues and review ESC plans.
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 6: What approaches to construction stormwater management does your DOT regularly use for highway projects? (Select all that apply)
State DOT Statewide State DOT district Project-by-project Types of projects Other
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 33 9 27 14 3
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.

Other:

  • The DOT requires all projects over an acre that require a general construction permit to follow our water quality specifications. All projects below an acre without a permit are required to follow requirements under a standard special.
  • State DOT Resident Construction Engineer office
  • Size of contributing area
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 7a: What construction stormwater management control measures have your DOT approved for use in highway construction? (Select all that apply)
State DOT Active treatment systems Bales (hay, straw, etc.) Bonded fiber matrix Check dams Construction de-watering Diversion berms/dikes Drainage swales/ditches Dust control Erosion control blankets
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 14 23 33 42 39 40 41 38 41
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 7b: What construction stormwater management control measures have your DOT approved for use in highway construction? (Select all that apply)
State DOT Erosion control logs Flexible growth medium Flocculants Hydromulching/seeding Inlet protection Level spreader Limitations of disturbance Mulching Other chemical treatments
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 42 22 20 42 41 22 41 39 11
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 7c: What construction stormwater management control measures have your DOT approved for use in highway construction? (Select all that apply)
State DOT Outlet protection Pipe slope drains Preserve existing vegetation Riprap Sediment basins Sediment traps Silt fence/barriers Sodding Stabilized construction entrances/exits
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 36 35 38 41 42 41 42 32 42
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 7d: What construction stormwater management control measures have your DOT approved for use in highway construction? (Select all that apply)
State DOT Subsurface drains Surface roughening Temporary stream crossing Turbidity barrier Turf reinforcement mats Water quality nonstructural controls Water quality structural controls Other
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 23 36 37 38 32 33 36 5
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.

Other:

  • Topography (landform), vegetative buffers, temporary stabilization (tracking, terracing, slope controls) phasing, administrative controls (all control measures are located in 107.25, 208, 213, 216 related to water quality and we allow non-standard control measures if approved by a project special or the Project Engineer.
  • We will also use temporary tanks and dewatering basins for active dewatering activities.
  • Gravel Access Approach
  • BMPs are determined by the contractor managing SWPPP.
  • NYS has a stormwater design manual written by our New York State DEC which includes standard permanent practices. We also have the Environmental Handbook for Construction Operations, also by New York State DEC, which covers standard temporary measures.
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 8: What types of flocculants does your DOT use for construction stormwater management? (Select all that apply)
State DOT Synthetic polymer (e.g., Polyacrylamide) Inorganic polymer (e.g., polyaluminum chloride) Other
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 1 2 7
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.

Other:

  • Used in some cases of sediment discharges
  • An approved listing is management by our Department of Natural Resources. I believe most are an anionic polyacrylamide, but cannot be certain.
  • We have the ability to allow anionic PAM but have not had anyone use it yet.
  • The DOT does not have restrictions on flocculants...flocculants used determined by contractor.
  • Unsure. My understanding is that we primarily use flocculants for disposal of materials containing hazardous chemicals, such as when we demolish polymer overlays on bridge decks. We avoid permanent stormwater management practices which require the intermittent addition of chemicals, and prefer to limit permanent maintenance to vegetation management and sediment removal where possible.
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 9a: Who is responsible for preparing and managing the SWPPP for a highway construction project at your DOT? (select all that apply)
State DOT O1 O2 O3 O4 O5 O6
Preparing Managing Preparing Managing Preparing Managing Preparing Managing Preparing Managing Preparing Managing
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New
Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wyoming
TOTAL 4 26 26 3 8 6 7 3 6 3 7 8
KEY:
O1. Construction Project Manager
O2. Design Engineer
O3. Environmental Control Specialist
O4. Environmental Engineer
O5. Environmental Department Manager
O6. Stormwater/Drainage Program Manager
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 9b: Who is responsible for preparing and managing the SWPPP for a highway construction project at your DOT (Select all that apply)?
State DOT O7 O8 O9 Other
Prep. Mngm. Prep. Mngm. Prep. Mngm. Prep. Mngm.
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 9 13 24 33 21 16 5 4
O7. DOT project management team
O8. Contractor
O9. Consultants

Prep. = Preparing Mngm. = Managing

Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.

Other:

Prepare and Manage

  • This would be for a design-bid-build project that is triggered to be incorporated into MS4 permit requirements. We have different methodologies for other contract types and internal projects (Property mgt, Colorado DOT Mtce, and Utility/Access and Special use permits).
  • Inspector

Prepare

  • District Environmental Planner
  • Agronomist
  • For Design-Build Projects the contractor prepares the SWPPP program but the department must approve the plan and oversee the plans during construction.
  • Agronomist

Manage

  • Resident Engineer
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 10: When does your DOT prepare the SWPPP for a highway construction project (Please select all that apply)?
State DOT During design and engineering During pre-construction Just prior to construction In conjunction with the NEPA Plan Other
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 25 15 8 4 7
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.

Other:

  • PF only prepares an SWPPP if the project is a Maintenance and Operations project that is greater than 1 acre, and does not involve a contractor.
  • This is very dependent on contract type. It is a requirement from the Form 128 Clearance process in most cases. Please note that Colorado is a practice based permit for our general construction and the design of the SWMP is completed on projects prior to advertisement on design-bid-build projects and modified by the contractor per our specifications when the project is active.
  • The DOT does not prepare the SWPPP. The contractor is required to complete the SWPPP in accordance with permitting requirements and must have it completed prior to the start of any earth-disturbing activities.
  • Contractor prepares SWPPP before getting a permit.
  • After a project is awarded.
  • This is the contractor’s responsibility. Usually, they consult out SWPPP preparation.
  • The design team completes SWPPP components as known in the design, and contractors prepare an implementation plan for unknown items such as schedule-related items, dewatering activities, etc.
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 11a: Which of the following parties typically performs the tasks related to the construction stormwater management at your DOT? (Select all that apply)
State DOT O1 O2 O3 O4
DOT Contr. Cons DOT Contr. Cons DOT Contr. Cons DOT Contr. Cons
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 40 29 19 37 5 15 36 30 22 18 36 7
O1. Monitor and track control measures
O2. Design guidance development
O3. Inspections
O4. Inspection deficiency remediation
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 11b: Which of the following parties typically performs the tasks related to the construction stormwater management at your DOT? (Select all that apply)
State DOT O5 O6 O7 O8 O9
DOT Contr. Cons DOT Contr. Cons DOT Contr. Cons DOT Contr. Cons DOT Contr. Cons
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 7 41 3 11 39 3 34 26 17 34 16 12 26 40 7
O5. Installation
O6. Maintenance
O7. Reporting
O8. Training project personnel
O9. Violation remediation
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 12: On average, what percentage of construction stormwater management inspections are conducted by consultants at your DOT?
State DOT 0-10% 11-20% 21-30% 31-40% 41-50% >50% Do not conduct Not Sure
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 15 5 4 2 2 5 6 3
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 13: Who is responsible for the cost to install and maintain control measures for highway construction projects at your DOT? (Select all that apply)
State DOT State DOT Contractor Agreed % contractor and DOT Other
Install Maintain Install Maintain Install Maintain Install Maintain
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 27 18 13 8 3 2 8 8
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.

Other:

Install and Maintain

  • The cost of installation and maintenance of control measures varies by project and may be included as either separate bid price items, incidental to something else, a change order, or a percentage of the total contract bid.
  • Cost is provided to the contractor through the contract.
  • Contractor may pay for controls that they damaged during their work or that need to be replaced due to how they phased the project.
  • There is a bid item for temporary erosion control, and the costs are included in the bidding process. The Contractor builds the costs into the bid. Additionally, erosion control is incorporated into the individual bid items.
  • Contractor bids a price and is paid to install, maintain and remove the SESC item.
  • Contractor is reimbursed by specific contract items. Maintenance is included with the upfront costs unless field conditions require additional control measures.

Install

  • During construction, the Contractor is not reimbursed for short-term stabilization and repair (such as covering an excavation area with straw prior to rain or repairing an eroded temporary construction access road), but is paid for building the permanent practices and for most of the temporary practices (i.e., we have contract pay items for silt fence, hydroseeding, mulch, topsoil and turf establishment, etc.).
  • The DOT pays the contractor by the appropriate contracting method. Design-bid-build is paid by pay item, design-build is paid lump sum.

Maintain

  • Typically DOT pays for installation but maintenance is included in that installation cost.
  • Maintenance is included in the cost of installation. The cost to replace depends on the reason for failure.
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 14: How are initial costs to install and maintain control measures for highway construction projects estimated at your DOT?
State DOT Standard estimating Use of estimated cost ranges Not sure Other
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 22 9 2 4
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.

Other:

  • We define per project in the quantities section of the SWMP (SWPPP) plan sets. The plan sets are part of the contract documents, and bids are prepared according to the contract type.
  • Use established costs for individual items and include a Stormwater Budget item for payment on the contract.
  • Combination of estimated cost ranges based on size/complexity and risk management
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 15: How does your DOT track construction stormwater management requirements or compliance? (Select all that apply)
State DOT O1 O2 O3 O4 O5 O6 O7 O8 Other
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 10 4 5 38 33 19 31 3 6
O1. Internal software program
O2. Off the shelf software program
O3. Proprietary software program
O4. Site investigations
O5. Field logs and databases
O6. Field apps used on a smartphone or tablet
O7. Photos and videos
O8. No standardized methodology is used statewide
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.

Other:

  • Standardized inspection forms
  • Files are kept in job box at the construction site.
  • Mostly with PDF form. But have a software/app used on some projects.
  • Spreadsheet using a unique name for each practice, similar to how bridges are tracked by Bridge Identification Number
  • Off the shelf software that is highly customized for our DOT.
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 16: How does your DOT monitor the performance of the construction stormwater management requirements for highway projects?
State DOT O1 O2 O3 O4 O5 O6 Other
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 5 20 35 33 16 6 4
O1. Using performance metrics
O2. Constant review of control measures
O3. Inspection of control measures in place
O4. Regular site investigations
O5. Internal audits
O6. Audits performed by consultants
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.

Other:

  • The DOT has contractors perform inspections per the general construction permit and we do audits of the projects per our MS4 permit. Innovative contracts may have additional QA/QC requirements built into the contract.
  • Through the use of a proprietary software program that contains quality controls such as picture documentation.
  • Contractor is responsible.
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 17: What performance metrics are used by your DOT to track construction stormwater management requirements? (Select all that apply)
State DOT O1 O2 O3 O4 O5 O6 O7 Other
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 3 1 1 1 3 4 2 1
O1. Number of control measures/BMPs in place
O2. Percentage of project costs used for installing control measures/BMPs
O3. Percentage of project costs used for maintaining control measures/BMPs
O4. Total cost of the construction stormwater management program for a project
O5. Percentage of time project is in non-compliance with stormwater permit requirements
O6. Regular intervals for inspecting control measures/BMPs
O7. Amount of time used to remedy deficiencies
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.

Other:

  • The DOT typically monitors matrices by compliance goals and built in matrix noted in our regulatory authority specification noted in subsection 208.09. Noncompliance to our water quality specifications is our target matrix.
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 18: On average, when an inspection deficiency occurs, how much time does it take to correct the deficiency? (This can be an approximate estimate)
State DOT < 5 days 5-10 days 11-15 days 16-20 days 21-25 days 26-30 days > 30days Other
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 17 15 2 1 0 0 0 7
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.

Other:

  • Our general construction permit requires all findings to be completed as soon as possible; immediately in most cases. We track progress on our Colorado DOT form 1176 to note any corrective actions that are not completed within this permit requirement.
  • 24 hours to remove the deficiency if sediment has entered into a stream, lake or wetland or left department right of way. Five days for other corrections.
  • Identified deficiencies are corrected in accordance with the permitting requirements.
  • Unsure - since we don’t have an electronic database to track these, it is difficult to determine.
  • Deficiencies listed as low, medium, or high priority. Low must be addressed within 7 calendar days. Medium 3 days. High within 24 hours.
  • Project dependent, 5–30 days
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 19a: What qualifications are required by NPDES permits for designers and inspectors at your DOT? (Select all that apply)
State DOT O1 O2 O3 O4
Desgn Insp. Instl. Desgn Insp. Instl. Desgn Insp. Instl. Desgn Insp. Instl.
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 19 4 0 2 1 0 6 8 1 9 18 9
O1. Professional Engineer (PE)
O2. Professional Landscape Architect (PLA)
O3. State stormwater program certification
O4. DOT administered certification
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 19b: What qualifications are required by NPDES permits for designers and inspectors at your DOT? (Select all that apply)
State DOT O5 O6 Other
Desgn Insp. Instl. Desgn Insp. Instl. Desgn Insp. Instl.
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 4 6 2 6 5 1 8 4 4
O5. State regulator administered certification
O6. National certification (CPESC, CISEC, etc.)
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.

Other:

Designer

  • Field Project Engineer must be certified through the NDDOT erosion and sediment control certification as well.
  • Qualification requirements vary by project.
  • Project Superintendents attend same certification program as DOT inspectors.
  • Licensed professional (PE, PG, RLA, PLS) for permanent stormwater control measures design; only with relevant experience for E&S design.
  • Registered Stormwater Writer (RSW)
  • Please note that the DOT is a practice based permit.
  • Note sure
  • EPA CGP Certification or Equivalent

Inspectors and Installers

  • Competent person. From our CONR5: Required Training: Effective April 30, 2010, the SPDES General Permit also requires the Prime Contractor and all subcontractors performing earthwork or soil-disturbing activities to identify at least one trained individual from each company who will be responsible for implementing the SWPPP and who shall be on-site on a daily basis when the company is performing soil disturbance activities. These activities include clearing, grubbing, grading, filling, excavation, stockpiling, demolition.
  • Landscaping and installation and maintenance of Erosion & Sediment Control practices. Training must consist of 4 hours of New York State DEC-endorsed Erosion & Sediment Control Training every 3 years. (Training is not required if the individual is a licensed Professional Engineer, registered licensed Landscape Architect, or CPESC.) Provide the information below for trained individuals who will be on-site and responsible for SWPPP implementation on this Contract (attach a separate sheet if needed for additional Trained Individuals).
  • Prior experience with State standards and specifications
  • NPDES does not require anything other than a “knowledgeable individual.” No requirements for installers.
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 20: Design guidelines for erosion and sediment control at your DOT are based on (Select all that apply)
State DOT DOT guidelines Federal guidelines General construction practices Rules of thumb Scientific research State regulator guidelines Other
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 40 21 20 10 11 34 3
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.

Other:

  • Primarily DOT guidelines based on state permit requirements and rules of thumb/current practices
  • The Department of Environmental Conservation guidelines
  • The Department of Environment, Great Lakes Energy has approved the Michigan Department of Transportation Soil Erosion and Sedimentation Control Program.
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 21: Which of the following parties are responsible for the development of design standards for construction stormwater management that are used by your DOT? (Select all that apply)
State DOT State DOT State environmental agency AASHTO FHWA Other state agency Other
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 37 22 4 6 0 4
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.

Other:

  • DOT Soil and Water Conservation Committee
  • EPA, NH is non-delegate
  • AGC
  • EPA
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 22: How often, on average, does your DOT update design guidelines for construction stormwater management?
State DOT Annual 2-3 yrs 4-5 yrs 6-7 yrs 8-9 yrs >10 yrs As needed Fed/State req. Other
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 2 4 4 2 0 1 20 5 4
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.

Other:

  • We use the EPA CGP.
  • Not sure
  • The major SWDM design manual has been updated about every 5 years in line with the nationwide permit updates.
  • Both as needed and when revisions to requirements occur
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 23: How often is your DOT subject to internal and regulatory audits of the construction stormwater management program for highway projects?
State DOT Annual 2-3 yrs 4-5 yrs >10 yrs As needed Fed/State req. Other
Int. Reg. Int. Reg. Int. Reg. Int. Reg. Int. Reg. Int. Reg. Int. Reg.
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 17 6 1 1 0 8 0 2 17 20 5 2 3 3
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.

Other:

Internal Audits

  • Our internal audit of Colorado DOT contractors per project is every 30 days per our MS4 Permit. Our regulating agency (CDPHE) typically conducts audits on our projects at about 12 per year.
  • The DOT does annual internal reviews of active road and bridge construction projects.
  • EPA NPDES audits

Regulatory

Audits

  • Citizen complaints
  • When determined by regulatory agency
  • As determined by NPDES regulatory agency. No specific timeframes.
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 24: In terms of construction stormwater management, in the last 10 years, has your DOT been fined for non-compliance or stormwater discharge issues?
State DOT Yes No
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 22 20
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 25: Please provide any website links to relevant documents from your DOT.
State DOT Web link
Alabama https://www.dot.state.al.us/programs/ConstructionStormwaterManagement.html
Alaska https://dot.alaska.gov/stwddes/desenviron/resources/stormwater.shtml
Arizona NA
Arkansas https://www.ardot.gov/wp-content/uploads/2020/10/2019-SWMP-ARDOT-7-1-19.pdf
https://www.ardot.gov/wp-content/uploads/2021/02/Erosion-and-Sediment-Control-Manual-12-6-16-Current.pdf
https://www.ardot.gov/divisions/environmental/natural-resources/stormwater-welcome-page/construction-program-overview/esc-training/
California https://dot.ca.gov/programs/construction
https://dot.ca.gov/programs/construction/storm-water-and-water-pollution-control
https://env.onramp.dot.ca.gov/sw/stormwater-management-plan-swmp
Colorado NA
Connecticut https://portal.ct.gov/DEEP/Water/Soil-Erosion-and-Sediment-Control-Guidelines
Delaware NA
Florida https://www.fdot.gov/docs/default-source/roadway/Drainage/files/Erosion-Sediment-Control.pdf
Georgia https://gaswcc.georgia.gov/sites/gaswcc.georgia.gov/files/related_files/site_page/GSWCC-2016-Manual-As-Approved-by-Overview-Council.pdf
https://www.dot.ga.gov/PartnerSmart/Business/Source/construction/2016WECS-CompleteManual.pdf
https://www.dot.ga.gov/PartnerSmart/DesignManuals/Drainage/Drainage%20Manual.pdf
Hawaii NA
Idaho https://itd.idaho.gov/env/
https://apps.itd.idaho.gov/Apps/FormFinder2DMZ/
Illinois https://idot.illinois.gov/transportation-system/environment/storm-water-management-program.html
Indiana https://www.in.gov/indot/engineering/environmental-services/storm-water/
Iowa https://iowadot.gov/design/design-manual#555672687-chapter-10--roadside-development-and-erosion-control
https://www.iowadot.gov/erl/current/CM/Navigation/nav7.htm
https://iowadot.gov/design/ShellLetters/StormWaterPermits/PollutionPreventionPlanSheetSample.pdf
https://iowadot.gov/construction_materials/earthwork_erosion/Erosion_Sediment_Control_Field_Guide.pdf
https://iowadot.gov/construction_materials/storm-water-inspection-information
https://iowadot.gov/construction_materials/earthwork_erosion/ESControl_training
Kansas https://www.ksdot.gov/bureaus/burconsmain/Connections/swppp.asp
https://kart.ksdot.gov/StandardDrawings/PrePackaged.aspx
Maine https://www.maine.gov/mdot/env/documents/bmp/BMP2008full.pdf
https://www.maine.gov/mdot/env/documents/bmp/Appendices.pdf
Maryland NA
Massachusetts NA
Michigan NA
Minnesota https://dot.state.mn.us/manuals/index.html
https://www.dot.state.mn.us/environment/erosion/index.html
Mississippi https://mdot.ms.gov/portal/stormwater
https://mdot.ms.gov/documents/Environmental/Plan/Stormwater/Stormwater%20Pollution%20Prevention%20Plan.pdf
https://mdot.ms.gov/documents/Environmental/Permits/Stormwater/Mississippi%20Dept.%20of%20Environmental%20Quality%20MS4%20Permit.pdf
https://mdot.ms.gov/documents/Environmental/Manuals/Stormwater/MDEQ%20Field%20Manual.pdf
https://mdot.ms.gov/documents/Environmental/Permits/Stormwater/Large%20Construction%20General%20Permit%20(MRS10).pdf
Missouri https://epg.modot.org/index.php/Category:806_Pollution,_Erosion_and_Sediment_Control
https://www.modot.org/sites/default/files/documents/2023%20Missouri%20Standard%20Specifi
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 25: Please provide any website links to relevant documents from your DOT.
State DOT Web link
c%20-%20MHTC%20%28April%202024%29_combined_0.pdf
Nebraska https://dot.nebraska.gov/projects/environment/roadside/
https://dot.nebraska.gov/projects/environment/stormwater/
https://dot.nebraska.gov/business-center/materials/approved-products/
Nevada https://www.dot.nv.gov/doing-business/about-ndot/ndot-divisions/stormwater
New Hampshire https://www.epa.gov/npdes/2022-construction-general-permit-cgp
New Jersey NA
New Mexico https://www.dot.nm.gov/infrastructure/environment/roadside-community-design-section/
https://realfilef260a66b364d453e91ff9b3fedd494dc.s3.amazonaws.com/fcd4d178-70ff-4a21-8ea5-2bede74c831b?AWSAccessKeyId=AKIAJBKPT2UF7EZ6B7YA&Expires=1709743647&Signature=J%2F7jSmVjQ0j%2BvIJzIt%2BEKr7kVe0%3D&response-content-disposition=inline%3B%20filename%3D%222019%20Specs%20for%20Highway%20and%20Bridge%20Construction.pdf%22&response-content-type=application%2Fpdf
New York State https://www.dot.ny.gov/divisions/engineering/design/dqab/hdm/chapter-8
https://www.dot.ny.gov/divisions/engineering/environmental-analysis/water-ecology/stormwater-management
https://extapps.dec.ny.gov/fs/docs/pdf/stormwaterdesignmanual.pdf
https://extapps.dec.ny.gov/fs/docs/pdf/erosionsediment_bluebook.pdf
https://dec.ny.gov/regulatory/permits-licenses/wastewater-stormwater-water-withdrawal/spdes-permit-program
https://extapps.dec.ny.gov/docs/water_pdf/constgp020001.pdf
North Carolina https://connect.ncdot.gov/resources/roadside/Pages/Soil-Water.aspx
https://connect.ncdot.gov/resources/roadside/Pages/Field-Operations.aspx
North Dakota https://www.dot.nd.gov/construction-and-planning/construction-planning/environmental/stormwater-management
Ohio https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification%20Files/832_07212023_for_2023.pdf
https://www.transportation.ohio.gov/wps/portal/gov/odot/working/engineering/hydraulic/location-design-vol-2/01-location-design-vol-2
Oklahoma https://oklahoma.gov/odot/business-center/pre-construction-design/roadway-design/support-units/oklahoma-roadway-drainage-manual.html
https://www.odot.org/roadway/roadway2019/IndexStandards2019.html
https://oklahoma.gov/odot/programs-and-projects/environmental.html
Pennsylvania NA
Rhode Island https://www.dot.ri.gov/business/contractorsandconsultants.php
South Dakota https://dot.sd.gov/doing-business/engineering/design-services/forms-manuals#listItemLink_0
Texas NA
Utah https://www.udot.utah.gov/connect/business/contractor-stormwater-resources/construction-longterm-stormwater-management/
Vermont NA
Virginia https://www.vdot.virginia.gov/doing-business/technical-guidance-and-support/location-and-design/water-resources/
https://www.vdot.virginia.gov/doing-business/technical-guidance-and-support/environmental/#d.en.101826
https://www.vdot.virginia.gov/doing-business/technical-guidance-and-support/technical-guidance-documents/iim-cd-2013-0101-environmental-and-safety-responsibility/
West Virginia NA
Wisconsin https://wisconsindot.gov/Pages/doing-bus/eng-consultants/cnslt-rsrces/environment/erosion-ctrl-drainage.aspx
https://wisconsindot.gov/Pages/doing-bus/eng-consultants/cnslt-rsrces/rdwy/default.aspx
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Question 26: Would you be willing to participate in a case example interview?
State DOT Yes No
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Dakota
Texas
Utah
Vermont
Virginia
West Virginia
Wisconsin
TOTAL 28 14
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 90
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 91
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 92
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 93
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 94
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 95
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 96
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 97
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 98
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 99
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 100
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 101
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 102
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 103
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 104
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 105
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 106
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 107
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 108
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 109
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 110
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 111
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 112
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 113
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 114
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 115
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 116
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 117
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 118
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 119
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 120
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 121
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 122
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 123
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 124
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 125
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 126
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 127
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 128
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 129
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 130
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 131
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 132
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 133
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 134
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 135
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 136
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 137
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 138
Suggested Citation: "Appendix B: Individual Survey Responses." National Academies of Sciences, Engineering, and Medicine. 2025. Construction Stormwater Program Management, Tracking, Reporting, and Compliance. Washington, DC: The National Academies Press. doi: 10.17226/29051.
Page 139
Next Chapter: Appendix C: Case Examples Questionnaire
Subscribe to Email from the National Academies
Keep up with all of the activities, publications, and events by subscribing to free updates by email.