GENERAL INFORMATION
| First & Last Name: | |
| Title/Role: | |
| Phone Number: | |
| Email: | |
| Your DOT: |
CONSTRUCTION STORMWATER MANAGEMENT
| Measure | Approved for use by your DOT |
|---|---|
| Active treatment system | |
| Bales (hay, straw, etc.) | |
| Bonded fiber matrix | |
| Check dams (rock, sandbag, socks, rolls, silt fence, tubes, etc.) | |
| Construction de-watering | |
| Diversion berms/dikes | |
| Drainage swales/ditches | |
| Dust control | |
| Erosion control blankets (channel, slope, etc.) | |
| Erosion control logs (wattles, sediment tubes, fiber rolls, composite socks, etc.) | |
| Flexible growth medium | |
| Flocculants | |
| Hydromulching/seeding (temporary, permanent, etc.) | |
| Inlet protection | |
| Level spreader |
| Measure | Approved for use by your DOT |
|---|---|
| Limitations of disturbance (grading limits, etc.) | |
| Mulching (grass, hay, wood chips, wood fibers, straw, etc.) | |
| Other chemical treatments | |
| Outlet protection | |
| Pipe slope drains | |
| Preserve existing vegetation | |
| Riprap | |
| Sediment basin | |
| Sediment trap | |
| Silt fence/barrier | |
| Sodding | |
| Stabilized construction entrances/exits | |
| Subsurface drains | |
| Surface roughening (tracking, stair-step grading, grooving, etc.) | |
| Temporary stream crossing | |
| Turbidity barrier (staked, floating, etc.) | |
| Turf reinforcement mats | |
| Water quality non-structural controls (stream buffers, vegetated conveyance systems, etc.) | |
| Water quality structural controls (detention ponds, vegetated filter strips, etc.) | |
| Other, please specify: ______________________ |
| Prepares the SWPPP | Manages the SWPPP | |
|---|---|---|
| Construction Project Manager | ||
| Design Engineer | ||
| Environmental control specialist | ||
| Environmental Engineer | ||
| Environmental Department Manager |
| Prepares the SWPPP | Manages the SWPPP | |
|---|---|---|
| Stormwater/Drainage Program Manager | ||
| DOT project management team | ||
| Inspector | ||
| Contractor | ||
| Consultants | ||
| Other, please specify: _____________________ |
RESPONSIBILITIES FOR CONSTRUCTION STORMWATER MANAGEMENT
| State DOT | Contractor | Consultants | |
|---|---|---|---|
| Monitor and track control measures | |||
| Design guidance development | |||
| Inspections | |||
| Inspection deficiency remediation | |||
| Installation | |||
| Maintenance | |||
| Reporting | |||
| Training project personnel | |||
| Violation remediation |
| Cost to Install | Cost to Maintain and Replace | |
|---|---|---|
| DOT pays for all of it. | ||
| The contractor pays for all of it. | ||
| An agreed upon percentage is paid for by the contractor and the rest is paid for by the DOT. | ||
| Other, please specify: _______________________ |
STORMWATER MANAGEMENT TRACKING AND INSPECTION
DESIGN STANDARDS AND QUALIFICATIONS
| Designers | Inspectors | Installers | |
|---|---|---|---|
| Professional Engineer (PE) | |||
| Professional Landscape Architect (PLA) | |||
| State stormwater program certification | |||
| DOT-administered certification | |||
| State regulatory administered certification | |||
| National certification (CPESC, CISEC, etc.) | |||
| Other, please specify: ________________________ |
CONSTRUCTION STORMWATER MANAGEMENT PROGRAM AUDITS
| Internal Audits | Regulatory Audits | |
|---|---|---|
| Annually | ||
| 2-3 years | ||
| 4-5 years | ||
| 6-7 years | ||
| 8-9 years | ||
| 10 years or more | ||
| As needed | ||
| When revisions to federal and state permit and regulatory requirements occur | ||
| Other, please specify: ________________ |
FINAL THOUGHTS
| First and Last Name: | |
| Phone Number: | |
| Email: |
We appreciate your participation in this study!