Suggested Citation: "Appendix B: SCWO Reliability and Maintenance (RAM) Log for 500-Hour HD." National Research Council. 2001. Analysis of Engineering Design Studies for Demilitarization of Assembled Chemical Weapons at Pueblo Chemical Depot. Washington, DC: The National Academies Press. doi: 10.17226/10182.

Appendix B
SCWO Reliability and Maintenance (RAM) Log for 500-Hour HD Hydrolysate Run

The data in Table B-1 were collected during the General Atomics engineering design study testing on the use of supercritical water oxidation (SCWO) technology as a secondary treatment step in the General Atomics Total Solution (GATS) for disposal of the mustard-agent-containing munitions stored at the Pueblo Chemical Depot.

REFERENCE

General Atomics. 2001. Assembled Chemical Weapons Assessment (ACWA), Engineering Design Studies, Draft Test Report, February 10. San Diego, Calif: General Atomics, Inc.

Suggested Citation: "Appendix B: SCWO Reliability and Maintenance (RAM) Log for 500-Hour HD." National Research Council. 2001. Analysis of Engineering Design Studies for Demilitarization of Assembled Chemical Weapons at Pueblo Chemical Depot. Washington, DC: The National Academies Press. doi: 10.17226/10182.

TABLE B-1 SCWO Reliability and Maintenance (RAM) Log for 500-Hour HD Hydrolysate Run

ID

Date

Time

Description of Item

GA Log Book No.

Page No.

Shutdown Caused?

Fix Time (hr)

Problem Type

System/ Component Involved

1

1/4/01

0:56

Nozzle plug

11574

56

Y

<1

Operational

Feed nozzle

2

1/5/01

12:07

Liquid letdown valve (Badger) repair

11574

58

N

2

Mechanical

Liquid letdown

3

1/5/01

12:07

Liquid letdown valve cannot hold level

11574

58

N

2

Mechanical

Liquid letdown

4

1/5/01

14:30

Gas/liquid separator gasket fails

11574

58

N

4

Mechanical

Gas/liquid separator

5

1/5/01

17:00

Low-pressure feed pump housing cracked

NA

NA

N

2

Error

Feed recirculation pump

6

1/5/01

17:40

Feed pump erratic

11574

59

N

<1

Operational

Feed pump

7

1/6/01

4:00

Gas analyzers erratic

11574

62

N

<1

Operational

Gas analysis train

8

1/6/01

8:10

TE-600 faulty reading

11574

62

N

<1

Operational

Reactor

9

1/6/01

8:20

Heat tracing on hot line

11574

62

N

<1

Error

Reactor

10

1/6/01

8:20

PT-463 faulty reading

11574

62

N

<1

Electrical

Air line

11

1/6/01

9:15

Letdown system solids accumulation

11574

63

N

1

Operational

GLS, hydroclone

12

1/6/01

9:18

Fuel pump packing repair

11574

63

N

2

Mechanical

Fuel pump

13

1/6/01

10:18

Gas analyzers not consistent with computer

11574

64

N

<1

Electrical

Gas analysis train

14

1/6/01

10:55

Feed pump erratic

11574

64

N

<1

Operational

Feed pump

15

1/6/01

16:38

Liquid letdown valve (Badger) repair

11574

66

N

2

Mechanical

Liquid letdown

16

1/6/01

18:45

Fuel line plug

11574

66

Y

2

Operational

Fuel tank

17

1/6/01

22:00

Fuel pump packing repair

NA

NA

N

2

Mechanical

Fuel pump

18

1/6/01

23:30

Gas sample line plug

11575

2

N

<1

Operational

Gas analysis train

19

1/7/01

14:20

Reactor plug

11574

71

Y

3

Operational

Reactor

20

1/7/01

19:23

Air flow control poor

11574

71

N

<1

Operational

Air line

21

1/8/01

12:49

Reactor bypassing

11574

75

Y

4

Operational

Reactor

22

1/8/01

15:33

Thermowell replacement

11574

76

N

<1

Corrosion

Reactor

23

1/8/01

18:00

Letdown system solids accumulation

NA

NA

N

1

Operational

GLS, hydroclone

24

1/8/01

20:33

Feed cross leak

11574

76

N

2

Error

Reactor

25

1/8/01

21:57

Reactor dump valve leak

11574

76

N

<1

Mechanical

Reactor

26

1/8/01

22:49

Nozzle plug

11574

76

N

4

Operational

Feed nozzle

27

1/8/01

22:57

Water pump ruptured diaphragm

11574

76

N

2

Mechanical

Water pump

28

1/9/01

2:32

Reactor surface TEs (thermocouples) faulty readings

11574

77

N

1

Electrical

Reactor

29

1/9/01

3:27

Badgers not working in auto mode

11574

77

N

<1

Computer

Computer

30

1/9/01

4:45

Computer type mismatch

11574

77

N

<1

Computer

Computer

31

1/9/01

6:47

Feed pump erratic

11574

77

N

1

Operational

Feed pump

32

1/9/01

6:50

Computer type mismatch

11574

77

Y

<1

Computer

Computer

33

1/9/01

9:50

Low-pressure feed pump seized

11574

78

N

1

Operational

Feed recirculation pump

34

1/10/01

10:00

Gas sample line plug

11574

85

N

<1

Operational

Gas analysis train

35

1/11/01

0:00

pH electrode fouled

NA

NA

N

<1

Operational

Liquid analysis train

36

1/11/01

16:36

Gas sample line plug

11574

94

N

<1

Operational

Gas analysis train

37

1/11/01

5:30

Clean P-350B check valves

11574

98

N

1

Operational

Feed pump

38

1/12/01

7:00

Badgers not working in auto mode

11574

99

N

<1

Computer

Computer

39

1/12/01

7:00

Bypassing behind Ti liner

11574

99

N

<1

Mechanical

Reactor

40

1/12/01

7:00

Potential computer problems

11574

99

N

<1

Computer

Computer

41

1/12/01

7:00

Thermowell replacement

11574

99

N

<1

Corrosion

Reactor

42

1/12/01

10:32

Liner thermocouple malfunction

11574

99

N

1

Mechanical

Reactor

43

1/12/01

15:07

pH meter apparently broken

11574

100

N

2

Mechanical

pH meter

44

1/12/01

15:35

Fuel tank runs dry

11574

100

Y

3

Error

Fuel system

45

1/12/01

19:00

PCV-437A not holding pressure

NA

NA

N

<1

Operational

Fuel system

46

1/12/01

19:39

Ruptured cooling water hose

11574

101

Y

<1

Operational

Cooldown HX

47

1/12/01

22:00

Added scaling chemicals to cooling water

NA

NA

N

<1

Operational

Cooling water system

48

1/13/01

14:14

Gas sample line plug

11575

2

N

<1

Operational

Gas analysis train

49

1/13/01

14:49

Compressor filters need replacing

NA

2

N

1

Operational

HP air compressors

50

1/13/01

21:58

PCV-357B not holding pressure

11575

4

N

<1

Operational

Feed system

51

1/13/01

21:58

Clean P-350B check valves

11575

4

N

1

Operational

Feed pump

52

1/13/01

21:58

P-420B B head leaking

11575

4

N

<1

Operational

Fuel pump

53

1/14/01

18:30

Air flow fluctuations

11575

10

N

<1

Operational

HP air compressors

54

1/14/01

23:50

Discharge and suction check valves cleaned

NA

NA

N

<1

Operational

Feed system

55

1/15/01

4:00

Added scaling chemicals to cooling water

NA

NA

N

<1

Operational

Cooling water system

Suggested Citation: "Appendix B: SCWO Reliability and Maintenance (RAM) Log for 500-Hour HD." National Research Council. 2001. Analysis of Engineering Design Studies for Demilitarization of Assembled Chemical Weapons at Pueblo Chemical Depot. Washington, DC: The National Academies Press. doi: 10.17226/10182.

Component ID

Maintenance/ Fix Type

Root Cause of Problem

Resolution to Problem

NA

Operational modification

Feed precipitation

Leave preheaters on at low setting

FCV-654A

Change-out

Faulty installation, stem bent

Change-out valve, rebuild correctly

FCV-654B

Change-out trim

Solids in valve

Better solids separation prior to valve

GLS-630

Replace gasket

Temporary gasket in use

Procure proper gasket

P-300B

Replace

Pump overpressured during cleanout

Replace pump, exercise care when blowing out lines

P-350B

Clean (flush)

Solids in pump

Periodic cleaning/flushing, including inlet strainer

GS-680

Drain

Water carryover

Modify post-V-680 trap

TE-600

Reposition

Thermocouple out of position

Replace and secure thermocouple

NA

Reposition

Incorrect installation

Reposition heat tracing

PT-463

Replace

TBD

TBD

GLS-630, SS-640

Clean (flush)

Titanium corrosion

Periodic flushing

P-420B

Repair

Normal wear

Normal maintenance

GS-680

Check connections

Connections incorrect

Correct connections

P-350B

Clean (flush)

Solids in pump

Periodic cleaning/flushing, including inlet strainer

FCV-654A

Adjustment

Improper adjustment

Adjust

TK-400B

Clean

Dirty fuel

Screen fuel when adding

P-420A

Repair

Normal wear

Normal maintenance

V-680

System modification

Mist carryover with salt deposition

Modify post-V-680 trap

R-550

Clean (flush)

Failure to rinse after prior run

Rinse reactor before restarting if feed processed for >0.5 hr

FCV-461

Adjustment

Improper adjustment of control pressure

Reset control pressure

R-550

Clean (flush)

Nonoptimal top insert and gasket

Install new top insert and gasket

R-550

Replace

Corrosion

Replace

GLS-630, SS-640

Clean (flush)

Titanium corrosion

Periodic flushing

R-550

Replace

Improper installation

Review assembly procedures with pipe fitters

FV-550

Replace

Normal wear

Rebuild

NA

Clean (flush)

Metal burr from feed cross (see no. 15)

Assemble fittings without galling

P-120B

Repair

Nozzle plug

Assemble fittings without galling

TE-554

Replace

Wet leads

Waterproof thermocouple connections

NA

Programming

Software problem

Edit program

NA

Programming

Software problem

Switch computers

P-350B

Clean (flush)

Solids in pump

Periodic cleaning/flushing, including inlet strainer

NA

Programming

Software problem

Edit program

P-300B

Clean (flush)

Solids precipitation in pump and lines

Clean

V-680

System modification

Mist carryover with salt deposition

Modify post-V-680 trap

AE-670

Clean (flush)

Solids buildup in probe housing

Periodic cleaning/flushing

V-680

System modification

Mist carryover with salt deposition

Modify post-V-680 trap

P-350B

Clean

Preventative maintenance

Clean

NA

Programming

Software problem

Edit program

R-550

Redesign

Mismatched components

New top insert and gasket

NA

Reboot

Power fluctuations

Reboot

R-550

Replace

Corrosion

Replace

TE-572x, 574x

Replace

Normal wear

Replace

AT-670

Replace

Unknown

Not resolved at this time

TK-400B

Refill

Hourly rounds neglected

Carry out hourly rounds

PCV-437A

Repair

Stem and seat worn

Rebuild

HX-610

Repair

Hose overheats, presumably blockage

Rework hoses

Cooling water

Added Nalco chemicals

Potential scaling in cooling water

Treat cooling water

V-680

System modification

Mist carryover with salt deposition

Modify post-V-680 trap

C-450

Change filter

Preventative maintenance

Changed desiccant air dryer filters on all compressors

PCV-357

Rebuild

Stem and seat worn

Rebuild

P-350B

Clean

Preventative maintenance

Clean

P-420B

Replace packing

B head leaking (packing)

Changed packing on B head

C-450

Adjustment

Insufficient compressor pressure

Set start pressure lower

P-350B

Clean

Preventative maintenance

Disassemble and clean

Cooling water

Added Nalco chemicals

Potential scaling in cooling water

Treat cooling water

Suggested Citation: "Appendix B: SCWO Reliability and Maintenance (RAM) Log for 500-Hour HD." National Research Council. 2001. Analysis of Engineering Design Studies for Demilitarization of Assembled Chemical Weapons at Pueblo Chemical Depot. Washington, DC: The National Academies Press. doi: 10.17226/10182.

ID

Date

Time

Description of Item

GA Log Book No.

Page No.

Shutdown Caused?

Fix Time (hr)

Problem Type

System/ Component Involved

56

1/15/01

16:24

Gas sample line plug

11575

17

N

<1

Operational

Gas analysis train

57

1/16/01

0:35

Scaling in the DPT lines

11575

20

N

<1

Operational

Reactor DPT

58

1/16/01

0:35

Hose replacement for cooling water to CDHX

11575

20

N

1

Operational

Cooling water system

59

1/16/01

0:35

Bad trim for FCV-654B

11575

20

N

<1

Operational

Liquid letdown

60

1/16/01

0:35

PCV-357B not holding pressure

11575

20

N

<1

Operational

Feed system

61

1/16/01

0:35

Discharge and suction check valves cleaned

11575

20

N

<1

Operational

Feed system

62

1/16/01

0:35

Thermowell replacement

11575

20

N

<1

Corrosion

Reactor

63

1/16/01

0:35

TE-571 broken on disassembly

11575

20

N

<1

Mechanical

Reactor

64

1/16/01

11:00

PCV-357A not holding pressure

NA

NA

N

<1

Operational

Feed system

65

1/16/01

17:27

Gas sample line plug

11575

26

N

<1

Operational

Gas analysis train

66

1/16/01

3:00

Discharge and suction check valves cleaned

11575

28

N

<1

Operational

Feed system

67

1/17/01

3:00

Added scaling chemicals to cooling water

11575

28

N

<1

Operational

Cooling water system

68

1/17/01

12:17

Gas sample line plug

11575

31

N

<1

Operational

Gas analysis train

69

1/17/01

17:00

HP air compressor C malfunction

11575

32

N

2

Mechanical

HP air compressors

70

1/18/01

2:45

PCV-460 not controlling properly

11575

35

N

<1

Operational

HP air line to reactor

71

1/18/01

9:35

Gas sample line plug

11575

37

N

<1

Operational

Gas analysis train

72

1/19/01

5:00

TE-571 broken on disassembly

11575

42

N

<1

Mechanical

Reactor

73

1/19/01

5:00

Thermowell replacement

11575

42

N

<1

Corrosion

Reactor

74

1/20/01

12:15

pH meter apparently broken

11575

48

N

2

Mechanical

pH meter

75

1/20/01

14:00

TE-641 malfunction

11575

48

N

<1

Mechanical

Letdown system

76

1/20/01

19:27

Gas sample line plug

11575

49

N

<1

Operational

Gas analysis train

77

1/20/01

20:10

Line from PT-551 to reactor head leaking

11575

50

Y

2

Mechanical

Reactor plumbing

78

1/20/01

22:12

Shutoff valve on gas letdown leaking

11575

50

N

2

Mechanical

Gas letdown

79

1/20/01

22:12

Reactor dump valve leaking

11575

50

N

2

Mechanical

Reactor

80

1/20/01

22:12

BPR on gas letdown not holding pressure

11575

50

N

2

Mechanical

Gas letdown

 

Source: General Atomics, 2001.

Suggested Citation: "Appendix B: SCWO Reliability and Maintenance (RAM) Log for 500-Hour HD." National Research Council. 2001. Analysis of Engineering Design Studies for Demilitarization of Assembled Chemical Weapons at Pueblo Chemical Depot. Washington, DC: The National Academies Press. doi: 10.17226/10182.

Component ID

Maintenance/ Fix Type

Root Cause of Problem

Resolution to Problem

V-680

System modification

Mist carryover with salt deposition

Modify post-V-680 trap

DPT-550

Clean (flush)

Salts build up in DPT lines

Flush lines

HX-610

Replace

Possible coolant overheating

Replace with high-temperature hose

FCV-654B

Replace

Scored trim, trim too large

Replace with M trim

PCV-357B

Clean

Dirty stem and seat

Disassemble and clean

P-350B

Clean

Preventative maintenance

Disassemble and clean

R-550

Replace

Corrosion

Replace

TE-571

Replace

Thermowell corrosion

Replace

PCV-357A

Clean

Dirty stem and seat

Disassemble and clean

V-680

System modification

Mist carryover with salt deposition

Modify post-V-680 trap

P-350B

Clean

Preventative maintenance

Disassemble and clean

Cooling water

Added Nalco chemicals

Potential scaling in cooling water

Treat cooling water

V-680

System modification

Mist carryover with salt deposition

Modify post-V-680 trap

C-450C

Repair

Check valve broken

Repair

PCV-460

Replace

Oil contamination/clogging frit

Disassemble and rebuild

V-680

System modification

Mist carryover with salt deposition

Modify post-V-680 trap

TE-571

Replace

Thermowell corrosion

Replace

R-550

Replace

Corrosion

Replace

AT-670

Replace

Interference from power wiring

Rearrange wiring

TE-641

Replace

Unknown

Replace with surface thermocouple

V-680

System modification

Mist carryover with salt deposition

Modify post-V-680 trap

NA

Replace

Fatigue/wear/corrosion

Weld new fitting to modified AE drilled through plug

FV-640B

Replace

Contamination in gas letdown

Replace

FV-550

Replace body

Overheating soft goods

Replace

PCV-646

Replace

Corrosion/erosion internals

Replace

Suggested Citation: "Appendix B: SCWO Reliability and Maintenance (RAM) Log for 500-Hour HD." National Research Council. 2001. Analysis of Engineering Design Studies for Demilitarization of Assembled Chemical Weapons at Pueblo Chemical Depot. Washington, DC: The National Academies Press. doi: 10.17226/10182.
Page 83
Suggested Citation: "Appendix B: SCWO Reliability and Maintenance (RAM) Log for 500-Hour HD." National Research Council. 2001. Analysis of Engineering Design Studies for Demilitarization of Assembled Chemical Weapons at Pueblo Chemical Depot. Washington, DC: The National Academies Press. doi: 10.17226/10182.
Page 84
Suggested Citation: "Appendix B: SCWO Reliability and Maintenance (RAM) Log for 500-Hour HD." National Research Council. 2001. Analysis of Engineering Design Studies for Demilitarization of Assembled Chemical Weapons at Pueblo Chemical Depot. Washington, DC: The National Academies Press. doi: 10.17226/10182.
Page 85
Suggested Citation: "Appendix B: SCWO Reliability and Maintenance (RAM) Log for 500-Hour HD." National Research Council. 2001. Analysis of Engineering Design Studies for Demilitarization of Assembled Chemical Weapons at Pueblo Chemical Depot. Washington, DC: The National Academies Press. doi: 10.17226/10182.
Page 86
Suggested Citation: "Appendix B: SCWO Reliability and Maintenance (RAM) Log for 500-Hour HD." National Research Council. 2001. Analysis of Engineering Design Studies for Demilitarization of Assembled Chemical Weapons at Pueblo Chemical Depot. Washington, DC: The National Academies Press. doi: 10.17226/10182.
Page 87
Next Chapter: Appendix C: Committee Meetings and Site Visits
Subscribe to Email from the National Academies
Keep up with all of the activities, publications, and events by subscribing to free updates by email.