Skip to main content

Criteria for Installing Automatic and Remote-Controlled Shutoff Valves on Existing Gas and Hazardous Liquid Transmission Pipelines

Completed

The committee will study current and potential methodologies and standards, including regulatory criteria, for deciding when an automatic shutoff valve, remote controlled valve or other equivalent emergency flow restricting device should be installed on pipelines.

Events

Criteria for Installing Automatic and Remote-Controlled Shutoff Valves on Existing Gas and Hazardous Liquid Transmission Pipelines (Meeting 5)

  • July 25 - 28, 2022
  • Past

This will be a two-day virtual committee meeting. Public Dates and Times: Day 1: Tuesday, July 26, 2022 - 11:00am - 5:00pm ET Day 2: Wednesday, July 27, 2022 - 12:00pm - 1:00pm ET *Participants are r...

Criteria for Installing Automatic and Remote-Controlled Shutoff Valves on Existing Gas and Hazardous Liquid Transmission Pipelines (Closed Session - Sept. 13)

  • September 13, 2023
  • 2:00 PM - 3:00 PM (EDT)
  • Closed
  • Past

This closed session was held to discuss report conclusions and recommendations and to review the report manuscript.

Criteria for Installing Automatic and Remote-Controlled Shutoff Valves on Existing Gas and Hazardous Liquid Transmission Pipelines (Closed Session - Sept. 6)

  • September 6, 2023
  • 2:00 PM - 5:00 PM (EDT)
  • Closed
  • Past

This closed session meeting was held to discuss report conclusions and recommendations and to review the report manuscript.

Criteria for Installing Automatic and Remote-Controlled Shutoff Valves on Existing Gas and Hazardous Liquid Transmission Pipelines (Closed Session - Sept. 5)

  • September 5, 2023
  • 2:00 PM - 5:00 PM (EDT)
  • Closed
  • Past

This closed session was held to discuss the report conclusions and recommendations and to review the report manuscript.

Criteria for Installing Automatic and Remote-Controlled Shutoff Valves on Existing Gas and Hazardous Liquid Transmission Pipelines (Closed Session - April)

  • April 18, 2023
  • 10:00 AM - 1:00 PM (EDT)
  • Closed
  • Past

This is a closed session for the committee to discuss report chapters.

Criteria for Installing Automatic and Remote-Controlled Shutoff Valves on Existing Gas and Hazardous Liquid Transmission Pipelines (Meeting 7)

  • March 2 - 3, 2023
  • Closed
  • Past

This closed session meeting was used for deliberation to finalize report recommendations, present preliminary survey results, provide updates on GIS analysis, and create a report drafting plan.

Subscribe to Email from the National Academies
Keep up with all of the activities, publications, and events by subscribing to free updates by email.