AASHTO. 2008. Guide for Consultant Contracting Washington, DC.
AGC/ABA. 2022. AGC/ABA Construction State Law Matrix. https://slm.agc.org/.
Alder, R. 2007. “UDOT Construction Manager General Contract (CMGC) Annual Report,” Utah Department of Transportation, Salt Lake City, UT.
Alder, R. 2011. CM/GC in Utah DOT, Presentation, FHWA CM/GC Peer Review, Salt Lake City, UT.
Alder, R.S. 2012. “Innovative Contracting in Utah DOT,” unpublished, FHWA CM/GC Peer Exchange Conference, Salt Lake City, UT.
Alleman, D., and D. Tran. 2020. “Challenges of Implementing Progressive Design-Build in Highway Construction Projects,” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(1):04519036.
Alleman, D., R.B. Duval, and K.R. Molenaar. 2017. “Roles and Responsibilities of Independent Cost Estimator in Construction Manager–General Contractor Highway Construction.” Transportation Research Record: Journal of the Transportation Research Board, No. 2630, pp. 15–22.
Alpert, M. 2007. “Progressive Design-Build: A Better Way?” Proceedings, 2007 Texas CEC Project Delivery Conference, Austin, TX.
Alvarez, J. 2011. “CM-at-Risk Arizona,” Presentation, FHWA CM/GC Peer Review, Salt Lake City, UT.
Arizona DOT. 2010. Intermodal Transportation Division: Construction Manager at Risk (CMAR) Guide. ADOT Construction Group, Phoenix, AZ.
ARDOT. 2023. CM-GC Guidelines and Procedures.
Bagwell, T., and M. Henley. 2020. “The Value of Transparency: What Open Books Contracting Is and Why It Matters,” Hourigan Group Blog, https://www.hourigan.group/blog/value-of-transparency-open-book-contracting.
Balis, J. 2011. “Alternative Project Delivery,” Presentation, FHWA CM/GC Peer Review, Salt Lake City, UT.
Barutha, P., H.D. Jeong, D.D. Gransberg, and A. Touran. 2021. “Impact of Collaboration and Integration on Performance of Industrial Projects,” Journal of Management in Engineering ASCE, Vol. 37(4). 10.1061 /(ASCE)ME.1943-5479.0000921.
Berenguel-Felices, F., A. Lara-Galera, and M.B. Muñoz-Medina. 2020. Requirements for the construction of new desalination plants into a framework of sustainability. Sustainability, 12(12), p. 5124.
Brown and Caldwell, Co. 2017. “Progressive Design-Build.” Accessed 2019. http://tablerockpartners.com/wpcontent/uploads/2017/05/PROGRESSIVE-DESIGN-BUILD-BASICS.pdf.
Carlson, J., and D.D. Gransberg. 2018. “Value of Early Contractor Involvement: Sellwood Bridge Replacement Project,” TR News, No. 316, p. 30.
Castro-Nova, I., G.M. Gad, A. Touran, B. Cetin, and D.D. Gransberg. 2017. “Evaluating the Influence of Differing Geotechnical Risk Perceptions on Design-Build Highway Projects,” Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering Vol. 4(4), 10.1061/AJRUA6.0000993.
Clark, L. 2015. “What’s So “Progressive” About Progressive Design-Build?” Water Design-Build Council. Accessed 2024. http://info.waterdesignbuild.com/blog/whats-so-progressive-aboutprogressive-design-build-0.
Clark, L. 2018. “How Does CMAR Differ from Design-Build?” Water Design-Build Council, WDBC Blog. http://info.waterdesignbuild.com/blog/how-does-cmar-differ-from-design-build?utm.
CPARB. 2017. General Contractor/Construction Manager Best Practices Manual, Washington State Department of Enterprise Services, Olympia, WA.
DBIA. 2017. Progressive Design-Build Primer, Washington, DC.
DBIA. 2021. “States with Design-Build Qualifications Based Selection.” https://dbia.org/advocacy/state/.
DBIA. 2023. Design-Build Best Practices. DBIA, Washington, DC.
DelDOT. 2023. “I-95 & SR 896 Interchange Project,” https://95896improvements.com.
De Marco, A. 2011. Project Management for Facility Organization, Springer DE, Berlin, Germany, pp. 15–42.
Dongo, J.L. 2020. Alternative Contracting Methods, White Paper, California High-Speed Rail Authority, Sacramento, CA, pp. 26–52.
FDOT. 2021. “Marion County ITS Operational Improvements – CMGC Services Request for Proposal Open Book Cost Estimating Requirements,” FDOT, Tallahassee, FL.
FHWA. 2016. “Construction Manager/General Contractor Contracting,” Federal Register, https://www.federalregister.gov/documents/2016/12/02/2016-28977/construction-managergeneral-contractor-contracting.
Finerty, J. 2011. “CM/GC in Nevada DOT, Presentation, FHWA CM/GC Peer Review, Salt Lake City, UT.
Finnie, D., N. Ali, and K. Park. 2018. “Enhancing Off-site Manufacturing Through Early Contractor Involvement in New Zealand” Proceedings of the Institution of Civil Engineers – Management, Procurement and Law 171(4): 176–185, https://doi.org/10.1680/jmapl.17.00029.”
Friedlander, M.C. 2003. Risk Allocation in Design-Build Construction Projects, White Paper, Schiff Harden, LLP, Chicago, IL.
GDOT. 2023. Construction Manager/General Contractor Manual, GDOT, Atlanta, Georgia, https://www.dot.ga.gov/PartnerSmart/DesignManuals/DesignBuild/GDOT_CMGC_Manual.pdf.
Gransberg, D.D. 2023. “Implementing Progressive Design-Build: Enabling Legislation May Not Be Required” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 15(4), 10.1061/JLADAH / LADR-1015.
Gransberg, D.D, J.E. Koch, and K.R. Molenaar. 2006. Preparing for Design-Build Projects: A Primer for Owners, Engineers, and Contractors, ASCE Press, ISBN 0-7844-0828-9, pp. 296.
Gransberg, D.D., and J.S. Shane. 2010. NCHRP Synthesis 402: Construction Manager-at-Risk Project Delivery for Highway Programs. Transportation Research Board of the National Academies, Washington, DC.
Gransberg, D.D., and J.S. Shane. 2013. “Defining Best-Value for Construction Manager/General Contractor Projects: The CMGC Learning Curve.” Journal of Management in Engineering, ASCE, 10.1061/(ASCE) ME.1943-5479.0000275.
Gransberg, D.D., D.M. Pittenger, and G. Chambers. 2017. Utility Coordination Using Alternative Contracting Methods, NCHRP 20-27, Task 373 Report, AASHTO Standing Committee on Highways, Washington, DC.
Gransberg, D.D., and K.R. Molenaar. 2019. “Critical Comparison of Progressive Design-Build and Construction Manager/General Contractor Project Delivery Methods,” Transportation Research Record: Journal of the Transportation Research Board, No. 2673, pp. 261–268.
Gransberg, D.D., M.C. Loulakis, and G.M. Gad. 2022a. The Engineer’s Project Delivery Method Primer: Uniform Definitions and Case Studies. ASCE Press, Reston, VA.
Gransberg, D.D., M. Pinto-Nunez, and N.J. Gransberg. 2022b. “Pricing Construction Manager/General Contractor Projects: With or Without ICE (Independent Cost Estimator),” Compendium, Paper TRBAM-22-02177, 101st Annual Meeting of the Transportation Research Board, Washington, DC.
Hill, G., and K. Hill. 2007. The People’s Law Dictionary. “Implied Covenant of Good Faith and Fair Dealing.” Publisher Fine Communications. http://dictionary.law.com/Default.aspx?selected=906.
Jeong, H.D., K. Choi, T. Ko, D.D. Gransberg, and C. Le. 2022. NCHRP Research Report 1025: Contingency Factors to Account for Risk in Early Construction Cost Estimates for Transportation Infrastructure Projects. Transportation Research Board of the National Academies, Washington, DC.
Johnson, L., and M. Zeltner. 2012. “The Alternative of Alternative Delivery: Progressive Design Build,” Proceedings, PNCWA 2012, Pacific Northwest Clean Water Association, Boise, ID.
Le, C., T. Ko, H.D. Jeong, K. Choi, and D.D. Gransberg. 2023. “Risk Identification, Prioritization, and Mapping for Early Construction Cost Contingency Estimation,” Compendium, Paper #TRBAM-23-00471, 102nd Annual Meeting of the Transportation Research Board, Washington, DC.
Lopez del Puerto, C., D.D. Gransberg, and M.C. Loulakis. 2016. “Contractual Approaches to Address Geotechnical Uncertainty in Design-Build Projects,” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10.1061/(ASCE)LA.1943-4170.0000202, 04516010.
Loulakis, M.C. 2013. Legal Aspects for Performance-Based Specifications for Highway Construction and Maintenance Contracts (No. Project 20-6).
Loulakis, M.C., N.C. Smith, D.L. Brady, R.E. Rayl, and D.D. Gransberg. 2015. NCHRP Legal Research Digest 68: Liability of Design-Builders for Design, Construction, and Acquisition Claims, Transportation Research Board, Washington, DC.
MacMahon, P. 2014. “Good Faith and Fair Dealing as an Underenforced Legal Norm.” Minnesota Law Review Vol. 99, (251). pp. 2051–2101.
Mesa, H.A., K.R. Molenaar, and L.F. Alarcon. 2019. “Comparative Analysis Between Integrated Project Delivery and Lean Project Delivery, International Journal of Project Management, 37, 395–409.
MSHA. 2023. “I-270 Innovative Congestion Management Project,” https://mdot-sha-project-portal-maryland.hub.arcgis.com/.
MDEQ. 2015. Project Delivery Guidance. https://www.michigan.gov/documents/deq/deq-ess-mfs-formsguidance-PDMguide_485573_7.pdf.
MnDOT. 2023. “I-35, I-535, Hwy 53 Twin Ports Interchange,” https://www.dot.state.mn.us/d1/projects/twin-ports-interchange.
Multnomah County. 2016. Sellwood Bridge CMGC Project, https://www.multco.us/bridges/sellwood-bridge.
NTTA. 2009. Project Delivery Method Implementation Manual, NTTA MAN-13 Rev 0.
ODOT. 2023. Request for Proposals Brent Spence Bridge Corridor Project, ODOT PID 116649, Columbus, OH.
Park, R. 2011. “CM/GC Benefits and Challenges,” Presentation, FHWA CM/GC Peer Review, Salt Lake City, UT.
Pelletier, D., Thompson, A., DiFore, B., and Wallace, J.F. 2019. “CM/GC Delivery Method for Federally-Procured Projects,” Fermi Lab Conference-19-641-LBNF, https://www.osti.gov/biblio/1605572.
Pinto-Nunez, M., C. Lopez del Puerto, and D.D. Gransberg. 2019. “Critical Analysis of Case Law: Are Partnering Charters Binding?” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 11(1), 10.1061/(ASCE)LA.1943-4170.0000283.
Reilly, J. 2010. Cost and Schedule Control. In: D. Hatem & D. Corkum, ed., Megaprojects: Challenges and Recommended Practices. 1st ed. Washington: American Council of Engineering Companies.
Roby, J. 2019. “Design-Build Overview – DBIA Mid-Atlantic Region,” Presentation, VDOT APD Division, http://www.virginiadot.org/business/design-build.asp.
Rowley, C. 2011. “CM/GC Contractor’s Perspective,” Presentation, FHWA CM/GC Peer Review, Salt Lake City, UT.
Salih, F., R. Eissa, and I.H.F. El-adaway. 2024. “Data-Driven Analysis of Progressive Design Build in Water and Wastewater Infrastructure Projects,” Journal of Construction Engineering and Management, 150(1), doi.org/10.1061/JCEMD4.COENG-13824.
Schierholz, J., and D.D. Gransberg. 2013. “Critical Analysis of the Value Added by the Independent Cost Estimate to the Construction Manager/General Contractor Project Delivery Method,” Compendium, Paper #13-0613, 92nd Annual Meeting of the Transportation Research Board, Washington, DC.
Shang, L. and G.C. Migliaccio. 2020. Demystifying Progressive Design Build: Implementation Issues and Lessons Learned Through Case Study Analysis, Organization Technology and Management in Construction 11.
Shrestha, B., P.P. Shrestha, R. Maharjan, and D.D. Gransberg. 2022. “Cost, Change Order, And Schedule Performance of Highway Projects: A Longitudinal Analysis,” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 14(1), 10.1061/(ASCE)LA. 1943-4170.0000523.
Steinkamp, M.W. 2017. “Factors Mediating the Relationships: Verbal Communication Styles.” Journal of Applied Developmental Psychology, 10(4), pp. 505–525.
TDOT. 2016. Request for Proposals, Interstate I-240 CM/GC Project, Shelby County, TN, State Project No. 79006 -1194-44, Nashville, TN.
Touran, A., D.D. Gransberg, and K. R. Molenaar. 2011. “A System for Selecting Project Delivery Methods in US Airports,” Journal of Airport Management, Airports Council International, Vol. 4(4), pp. 305–314.
UDOT. 2022. “Bangerter 4700 South Interchange Project,” 2022, https://www.bangerter4700south.com/.
VDOT. 2022. Progressive Design-Build Evaluation Guidelines, VDOT, Richmond, VA.
WCEC Engineers, Inc. 2011. CMGC Process Report—Construction Phase: Syracuse Road; 1000 West to 2000 West, Davis County, Syracuse, Utah, Utah Department of Transportation, Salt Lake City, UT, pp. 5.
West, N., and J. Schierholz. 2011. “Summary of Presentations” CM/GC Peer Review, Salt Lake City, UT.
West, N.J.N., D.D. Gransberg, and J. McMinimee. 2012. “Effective Tools for Projects Delivered Using the Construction Manager-General Contractor Method,” Transportation Research Record: Journal of the Transportation Research Board, No. 2268, pp. 33–42.
WSDOT. 2023. “Request for Qualifications, Independent Cost Estimate (ICE) Services for Olympic Region’s Progressive Design Build Program,” WSDOT, Olympia, WA.