Courtesy of Norman Y. Mineta San Jose International Airport
| Starting Operations | June/13/2022 | ||||
|---|---|---|---|---|---|
| Type of aircraft/pax capacity | B787-8 with 214 seats or B787-9 with 216 seats | ||||
| Ticket Counter and Gates | Ticket Counters 41-44 MG plans Gate 15, 17/18 Issue. |
||||
| Rooms/Office Space | B1701, B1703, B1713 (F1721 Cage Store) Cage items can go |
||||
| Flight schedule - Days/arrival time/departure time | 5x a week (not Wed, Fridays) 1755 arrival, 1955 departure Starting June 20, 2022; 7 days a week |
||||
| Number | Title | Section | Airline | Notes, Action Items, Status | Completed (Y/N) |
| 1 | Television implementation | Airport ATS | No changes from previous. | Pending final Ops; end of May confirm | Y |
| 2 | Telephone implementation, ticket counter and gate phones too | Airport ATS | Should Use existing, check with C.S. | Configured and ready for use 6/13; additional work needed. PCs’ our connection. | Y |
| 3 | Set up Airline on AirIT environment for verification | Airport ATS | Pending confirmation can reinstate with S.S. Amadeus/S.S. | Pending Terminal Management and IT; CC.S. couldn’t find Air-to-ground and needs assist 5/6/22. Airline good//Fenix needs work | Y |
| 4 | Radio implementation | Airport ATS | Radio present, need data for new license-IT? | Use existing. C.S. moving. Antenna and Equip still present active, but connection air/ground copper pair run is gone to their IDF is gone. FIS cable for airline- C. S. having Protech run always Airline to Fenix/Airline. Jack to cross connect Airline to complete connection and Airline/Fenix radio to jack still needs their work. Fenix needs Air-to-ground radio room work 5/27/22; onsite requested-Jen. | Y |
| 5 | New Circuit for Airline | Airport ATS | N/A, Needs to check. | C.S. and Ops checking last week April, 1st Week May. AIRLINE needs to label their stuff. Have circuit, nothing changed. Mobile Hotspot. Jen needs radio technician prior to coming due to radio down 2 years. | Y |
| 6 | Network implementation | Airport ATS | Need confirmation from AIRLINE existing acceptable; network existing unless some changes needed. | Due to office moves, some coordination required to interact with Fenix Lease space; Fenix will need own internet connection. Jen ordering lines for new offices. Give address. Fenix separate from AIRLINE needs integration. C.S., Danny V. PC in office need | Y |
| final once installed. Air-IT for ticket counter, gates. Danny to check for Fenix; 8 cables to room for Fenix. Fenix using Myfi until August. | |||||
| 7 | Call tree recording/Courtesy Phone | Airport ATS | Need Cust Svc to implement AIRLINE into system; existing-AIRLINE needs Ops to confirm | Follow up to confirm AIRLINE is still in the system. Phones same system. Danny Network Eng Fenix, Network eng AIRLINE -Vicky Day | Y |
| 8 | Shared use billing implementation | Airport Finance | Contract/BI to commence billing in July | N/A; No shared Use will be implemented. | Y |
| 9 | FIDS implementation | Airport Operations | Simran | No changes from last time; Ops will double check later May. Need to test AIRLINE apps (Amadeus/Sim) | Y |
| 10 | EASE-Shared use implementation | Airport Operations | Simran | Opertional Items are in process and pending completion date with no anticipated delays or issues before end of May. Need to test AIRLINE apps (Amadeus/Sim) | Y |
| 11 | CUSS kiosk implementation | Airport Operations | All Common Use items. Sim | Pending Terminal Management, confirming with C.S.; working for common use. 5/26 Update - AIRLINE working with Amadeus on getting kiosks up and running. Test (Amadeus/Sim) | Y |
| 12 | Airline Baggage System Implementation - Boarding Pass and Airline Tag Test | Airport Operations | Simran to coordinate with AIRLINE/Fenix | Check routing with VI | Y |
| 13 | Physical ramp conditions (striping, lighting, paving) | Airside/Ramp Area | Former APS parking; Ian coordinating | No changes from last time. | Y |
| 14 | GSE staging at gate | Airside/Ramp Area | Former APS parking; Ian coordinating | Ops confirmation (laydown behind TA+ available). Fenix laydown 3600 sf. Plugs need Form A for Airline wall ground service laydown (Terminal A) by gate 7. Equip delivery May 23 est. Ian confirmed in. | Y |
| 15 | Gate schedule coordination other airlines | Airside/Ramp Area | Gate Schedules and traffic processing | N/A (pending G15 status); Ops will do a final double check prior to ops late May | Y |
| 16 | Gate fit testing | Airside/Ramp Area | N/A | N/A | Y |
| 17 | Airline baggage - Program outbound Airline belt and carousel | Airside/Ramp Area | Simran | Same as previous, Ops will confirm final | Y |
| 18 | Airline baggage - Inbound/outbound | Airside/Ramp Area | Simran | Same as previous, Ops will confirm final | Y |
| 19 | Assessment for 180 kva GPU requirements | Airside/Ramp Area | Ian | N/A (Same gate ops as before and confirmed Fenix/AIRLINE bringing in non electric equipment for the op as contingency. | Y |
| 20 | Any RON needs? | Airside/Ramp Area | Ian | N/A, Normal op. | Y |
| 21 | Airline vehicle parking (airside) | Airside/Ramp Area | Ian | N/A, Same as previous. | Y |
| 22 | Airfield painting required | Airside/Ramp Area | Ian | N/A | Y |
| 23 | Ramp storage needs | Airside/Ramp Area | Ian | AIRLINE start date confirmation (laydown behind TA+ available by Gate 7). Fenix paying for laydown, Y Cage @ G16 still AIRLINE. | Y |
| 24 | Airline baggage reconciliation System Install | Airside/Ramp Area & Properties | Ian | AIRLINE should test system next couple of weeks but it is at the Airlineg make-up area as of 5/15. | ? |
| 25 | Door prop requirements | Airline Badging/Security | Jay | Pending Security; ongoing until all staff completed. Current staff 15 per Jay, min acceptable | Y |
| 26 | Coordination with TSA | Airline Badging/Security | Jay | Pending Security; ongoing until all staff completed. Current staff 15 per Jay, min acceptable | Y |
| 27 | Card Reader Requirements / Ramp Access | Airline Badging/Security | Jay | Pending Security; ongoing until all staff completed. Current staff 15 per Jay, min acceptable | Y |
| 28 | Airline Badging Process/Ramp Driving | Airline Badging/Security | Jay | Pending Security; ongoing until all staff completed. Current staff 15 per Jay, min acceptable | Y |
| 29 | Duty Free | Duty Free Shopping | Properties and DUFRY | Info provided to DUFY by Airside Prop | Y |
| 30 | Provide ticket and gate counter cores and keys | Facilities | Locks and access; Mike B. | Pending Terminal Management & FAC; rekeyed AIRLINE, Fenix needs new; Ops needs copies when completed | N/A |
| 31 | Smartphone Boarding Pass | FIS Holdroom & Terminal Areas | CBP items/Simran | Pending AIRLINE; Pam | Y |
| 32 | Holdroom seating, traffic flow, etc. | FIS Holdroom & Terminal Areas | Simran | No changes, item can be closed as of 5/26 | Y |
| 33 | 2nd boarding pass scanner at gate | FIS Holdroom & Terminal Areas | CBP items/Simran | Biometrics still needs to be setup with AIRLINE; Jen and Pam. Need to test and scan 15 and 18. | Y |
| 34 | Move in coordination - Landside delivery, parking, etc. | Landside | Already present | Ops confirmed all same as previous Ops. N/A | Y |
| 35 | Bus announcements | Landside | Public Transport /Ground Transport | Pending LS- Marty to contact sign shop to verify bus no change (John for automated voice on bus) | Y |
| 36 | Airline staff parking requirements | Landside | Fenix coordinating with Valerie | Status: SP Plus (AIRLINE employee parking needs agreement) | Y |
| 37 | Website changes | Marketing/Customer Service/Comms | Simran | Terminal waiting for updates from AIRLINE as of 5/26 so we can have the website updated | Y |
| 38 | Visitor Gifts | Marketing/Customer Service/Comms | Contact Marketing if applicable | Marketing responding to all task items separately via email (S.W.) We need Ducks. Ducks confirmed. | Y |
| 39 | SJC Press Distribution List - to Airline | Marketing/Customer Service/Comms | Need to confirm if event | Pending Marketing. As of 5/26, Customer Experience (Vicki) was going to have some ducks and something like cake or Airline balloons for the launch. | Y |
| 40 | Press release - DOT Approval (tickets on sale) | Marketing/Customer Service/Comms | Confirmation pending International agreement | N/A Tickets already on sale. Remind marketing | Y |
| 41 | Organize promotional campaign for Airline | Marketing/Customer Service/Comms | AIRLINE will need to request | Pending Marketing | Y |
| 42 | Organize inaugural flight activities | Marketing/Customer Service/Comms | AIRLINE will need to request | Pending Marketing/Air Service. As of 5/26, Customer Experience (Vicki) has a few things planned (ducks and cake or Airline Balloons) | Y |
| 43 | Media Advisory - DOT Approval (introduce airline to community) | Marketing/Customer Service/Comms | N/A | N/A, not required, Air service will advise | Y |
| 44 | Introductions to business community | Marketing/Customer Service/Comms | N/A | N/A, not required, Air service will advise | Y |
| 45 | Identify any specific language needs | Marketing/Customer Service/Comms | N/A | N/A, not required, Air service will advise | Y |
| 46 | Google indoor mapping | Marketing/Customer Service/Comms | Can occur after launch | N/A, find out who manages this; Vicky may know | Y |
| 47 | Educate Airport/Information Desk volunteers | Marketing/Customer Service/Comms | Fenix contact for Operations number pending | Pending TM | Y |
| 48 | Airline lost and found information | Marketing/Customer Service/Comms | Fenix contact for Operations number pending | Received for AIRLINE | Y |
| 49 | Coordination with CBP/FIS agencies | Miscellaneous | AIRLINE/Fenix processing | Pending AIRLINE | Y |
| 50 | Paging system implementation | Operations | Sim | Ops confirmed existing fine, Fenix/AIRLINE need training, Ops will confirm just before launch. Alex to confirm/training. | Y |
| 51 | BHS Agreement between Airline and TSA | Operations - Security | AIRLINE | Pending Security. AIRLINE to add letter to permit Fenix Airline baggage handling. | Y |
| 52 | Cage Buildout | Planning and Development | N/A | Same as AIRLINE previous; N/A | Y |
| 53 | Wheelchair services | Properties | Fenix to handle | AS of 5/26, 1/2 have been delivered. | Y |
| 54 | Verify number of ticket counters Airline will use | Properties | Ticket Counter | As of 5/26, AIRLINE confirmed 4 ticket counts (41 - 44) | Y |
| 55 | Verify City Business License in Place | Properties | Business License search. | Properties Fenix and AIRLINE done | Y |
| 56 | SmarteCartes - Ensure Appropriate Quantity for Airline | Properties | Need to coordinate ensure no change from last time | N/A. No changes from last time. | Y |
| 57 | Security Deposit and Insurance Certificate | Properties | AIRLINE OA-19 revision:Fenix Waiting on LOC/Waiting on City to identify COI Limits | Pending Properties: Seth had copy, sent to Accounting. AIRLINE onsite; fenix will need to send hard copy once agreement sent for signature. | AIRLINE Y; Fenix N |
| 58 | Return of Environmental Docs | Properties | Fenix Permit/AIRLINE OA | Fenix/Environmental done with Permit; Enviro Q | Y |
| 59 | Provide new entrant package to Airline | Properties | N/A | N/A | Y |
| 60 | Provide assistance with off-Airport office freight needs | Properties | N/A | No need per AIRLINE/Fenix | Y |
| 61 | Property Manager assigned | Properties | 5/3/2021 Martin. 9/21 Seth. 3/22 Martin | N/A TSA Introduction Letter to Scott completed. | Y |
| 62 | Prepare all required billing instructions | Properties | Pending June | Pending Properties | IP |
| 63 | Obtain Executed Lease & Operating Agreement | Properties | AIRLINE Signed | Pending Properties: Dupe See 75 | Y |
| 64 | New Entrant Questionnaire Due from Airline | Properties | N/A for AIRLINE, N/A for Fenix (GH) | N/A | N/A |
| 65 | Identify type (sig) and prepare agreement | Properties | Non-Sig draft pending AIRLINE signature | Pending Properties. OA-19 needs to be executed. | Y |
| 66 | Identify terminal support space requirements | Properties | Same cage, same ramp, less office AIRLINE, Office added Fenix | Pending Properties | Y |
| 67 | Identify improvements, coordinate Form A/B process | Properties | Electrical chargers | Advised no chargers on gates; Ops may allow install on ramp wall; Ian status asked 4/29/22. 5/3/22 | Y |
| 68 | Identify ground handler selected by Airline, prepare permits as needed | Properties | Fenix | Pending Properties; Fenix Permit Completed; pending lease of space | Y |
| 69 | Identify cargo space requirements, prepare lease as needed | Properties | Fenix/AIRLINE | 1) No Cargo required 2) AIRLINE OA Office space. 3) Fenix Lease near Ofc and Ramp | Y |
| 70 | Fueling | Properties | Fueling confirmed by Pam | AIRLINE confirmation with Swissport | Y |
| 71 | Currency exchange/ATMs | Properties | N/A | N/A (ATM is US currency only) | Y |
| 72 | Catering | Properties | Food and Int Trash | Pending AIRLINE contracts | Y |
| 73 | ATO offices requirements | Properties | B1701 selected | Pending AIRLINE Agreement (reduced space) | Y |
| 74 | Assign new mail box | Properties | N/A | Pending Properties; checking what happened to AIRLINE old mail keys | Y |
| 75 | Airline Agreement | Properties | N/A | Draft pending AIRLINE signature; address corrected, AIRLINE signing 6/1/22. Returned 6.6.22 signed. | Y |
| 76 | Adjust concessions hours as required | Properties | Pending | Properties to send info to concessions | Y |
| 77 | Review any Form A/B required for start up | Properties P&D | See item 73 | (Dupe) | N/A |
| 78 | Authorized Signatory Introduction for Airline and Parking | Properties; Security | Jen Authorized; Paperwork submitted and pending approval | Pending Security/LS. Staff half processed. | Y |
| 79 | Update directory signage | Signage | Changes?, If so Zar - Sign Package sent to Airline | N/A; overall redo with Zar discussed. | Y |
| 80 | Ticketing Queue Signage (11x14’s) | Signage | Changes?, If so Zar - Sign Package sent to Airline | Pending Terminal Management coord with Zar for final end of May; all old signage exists. | Y |
| 81 | Signs for Leased Office Space | Signage | Changes?, If so Zar - Sign Package sent to Airline | Pending Properties | Y |
| 82 | Roadway Traffic Sign Revisions | Signage | Changes?, If so Zar - Sign Package sent to Airline | N/A | Y |
| 83 | Curbside Signage | Signage | Changes?, If so Zar - Sign Package sent to Airline | N/A | Y |
| 84 | Courtesy phone numbers | Signage | Same as #7 - See #7 | Pending TM (Dupe?) | Y |
| 85 | Airport provided regulatory signage | Signage | Simran | As of 5/26, pending AIRLINE availability to review | Y |
| 86 | Sterile Corridor and Conflict Training | Training | Simran | As of 5/26, pending AIRLINE availability to train | N/A |
| 87 | Shared use system training | Training | Simran | As of 5/26, pending AIRLINE availability to train | Y |
| 88 | Obtain summary of Airline emergency plan, tarmac delay plan | Training | AIRLINE/Fenix to provide | IPm IAN/Sim. On website | Y |
| 89 | Jet bridge training | Training | Simran/ATEM | As of 5/26, pending AIRLINE availability to train | Y |
| 90 | Issue Airline a copy of the Airport Emergency Plan | Training | Done, per Ian, Operations will reach out to Fenix | Pending Pam has. | Y |
| 91 | Brief airline on arrival/departure delay notifications | Training | They understand notifications. | As of 5/26, pending AIRLINE availability to train | Y |
| 92 | Airline baggage hygiene training | Training | Simran/VI | As of 5/26, pending AIRLINE availability to train | Y |
| 93 | International Trash | Fenix to coordinate | AIRLINE contract | Y | |
| 94 | Pandemic Compliance Docs | Fenix to coordinate | Marty will check what is required. None Required. | N/A | |
| 95 | AIRLINE International docs | AIRLINE to coordinate with DHS | Landing Rights Approved | Y |
| Starting Operations | June/13/2022 | ||||
| Type of aircraft/pax capacity | B787-8 with 214 seats or B787-9 with 216 seats | ||||
| Ticket Counter and Gates | Ticket Counters 41-44 MG plans Gate 15, 17/18 Issue. |
||||
| Rooms/Office Space | B1701, B1703, B1713 (F1721 Cage Store) Cage items can go |
||||
| Flight schedule - Days/arrival time/departure time | 5x a week (not Wed, Fridays) 1755 arrival, 1955 departure Starting June 20, 2022; 7 days a week |
||||
| Number | Title | Section | Airline | Notes, Action Items, Status | Completed (Y/N) |
| 1 | Television implementation | Airport ATS | No changes from previous. | Pending final Ops; end of May confirm | Y |
| 2 | Telephone implementation, ticket counter and gate phones too | Airport ATS | Should Use existing, check with C.S. | Configured and ready for use 6/13; additional work needed. PCs’ our connection. | Y |
| 3 | Set up Airline on AirIT environment for verification | Airport ATS | Pending confirmation can reinstate with S.S. Amadeus/S.S. | Pending Terminal Management and IT; CC.S. couldn’t find Air-to-ground and needs assist 5/6/22. Airline good//Fenix needs work | Y |
| 4 | Radio implementation | Airport ATS | Radio present, need data for new license-IT? | Use existing. C.S. moving. Antenna and Equip still present active, but connection air/ground copper pair run is gone to their IDF is gone. FIS cable for airline- C. S. having Protech run always Airline to Fenix/Airline. Jack to cross connect Airline to complete connection and Airline/Fenix radio to jack still needs their work. Fenix needs Air-to-ground radio room work 5/27/22; onsite requested-Jen. | Y |
| 5 | New Circuit for Airline | Airport ATS | N/A, Needs to check. | C.S. and Ops checking last week April, 1st Week May. AIRLINE needs to label their stuff. Have circuit, nothing changed. Mobile Hotspot. Jen needs radio technician prior to coming due to radio down 2 years. | Y |
| 6 | Network implementation | Airport ATS | Need confirmation from AIRLINE existing acceptable; network existing unless some changes needed. | Due to office moves, some coordination required to interact with Fenix Lease space; Fenix will need own internet connection. Jen ordering lines for new offices. Give address. Fenix separate from AIRLINE needs integration. C.S., Danny V. PC in office need | Y |
| final once installed. Air-IT for ticket counter, gates. Danny to check for Fenix; 8 cables to room for Fenix. Fenix using Myfi until August. | Y | ||||
| 7 | Call tree recording/Courtesy Phone | Airport ATS | Need Cust Svc to implement AIRLINE into system; existing-AIRLINE needs Ops to confirm | Follow up to confirm AIRLINE is still in the system. Phones same system. Danny Network Eng Fenix, Network eng AIRLINE -Vicky Day | Y |
| 8 | Shared use billing implementation | Airport Finance | Contract/BI to commence billing in July | N/A; No shared Use will be implemented. | Y |
| 9 | FIDS implementation | Airport Operations | Simran | No changes from last time; Ops will double check later May. Need to test AIRLINE apps (Amadeus/Sim) | Y |
| 10 | EASE-Shared use implementation | Airport Operations | Simran | Opertional Items are in process and pending completion date with no anticipated delays or issues before end of May. Need to test AIRLINE apps (Amadeus/Sim) | Y |
| 11 | CUSS kiosk implementation | Airport Operations | All Common Use items. Sim | Pending Terminal Management, confirming with C.S.; working for common use. 5/26 Update - AIRLINE working with Amadeus on getting kiosks up and running. Test (Amadeus/Sim) | Y |
| 12 | Airline Baggage System Implementation - Boarding Pass and Airline Tag Test | Airport Operations | Simran to coordinate with AIRLINE/Fenix | Check routing with VI | Y |
| 13 | Physical ramp conditions (striping, lighting, paving) | Airside/Ramp Area | Former APS parking; Ian coordinating | No changes from last time. | Y |
| 14 | GSE staging at gate | Airside/Ramp Area | Former APS parking; Ian coordinating | Ops confirmation (laydown behind TA+ available). Fenix laydown 3600 sf. Plugs need Form A for Airline wall ground service laydown (Terminal A) by gate 7. Equip delivery May 23 est. Ian confirmed in. | Y |
| 15 | Gate schedule coordination other airlines | Airside/Ramp Area | Gate Schedules and traffic processing | N/A (pending G15 status); Ops will do a final double check prior to ops late May | Y |
| 16 | Gate fit testing | Airside/Ramp Area | N/A | N/A | Y |
| 17 | Airline baggage - Program outbound Airline belt and carousel | Airside/Ramp Area | Simran | Same as previous, Ops will confirm final | Y |
| 18 | Airline baggage - Inbound/outbound | Airside/Ramp Area | Simran | Same as previous, Ops will confirm final | Y |
| 19 | Assessment for 180 kva GPU requirements | Airside/Ramp Area | Ian | N/A (Same gate ops as before and confirmed Fenix/AIRLINE bringing in non electric equipment for the op as contingency. | Y |
| 20 | Any RON needs? | Airside/Ramp Area | Ian | N/A, Normal op. | Y |
| 21 | Airline vehicle parking (airside) | Airside/Ramp Area | Ian | N/A, Same as previous. | Y |
| 22 | Airfield painting required | Airside/Ramp Area | Ian | N/A | Y |
| 23 | Ramp storage needs | Airside/Ramp Area | Ian | AIRLINE start date confirmation (laydown behind TA+ available by Gate 7). Fenix paying for laydown, Y Cage @ G16 still AIRLINE. | Y |
| 24 | Airline baggage reconciliation System Install | Airside/Ramp Area & Properties | Ian | AIRLINE should test system next couple of weeks but it is at the Airlineg make-up area as of 5/15. | ? |
| 25 | Door prop requirements | Airline Badging/Security | Jay | Pending Security; ongoing until all staff completed. Current staff 15 per Jay, min acceptable | Y |
| 26 | Coordination with TSA | Airline Badging/Security | Jay | Pending Security; ongoing until all staff completed. Current staff 15 per Jay, min acceptable | Y |
| 27 | Card Reader Requirements / Ramp Access | Airline Badging/Security | Jay | Pending Security; ongoing until all staff completed. Current staff 15 per Jay, min acceptable | Y |
| 28 | Airline Badging Process/Ramp Driving | Airline Badging/Security | Jay | Pending Security; ongoing until all staff completed. Current staff 15 per Jay, min acceptable | Y |
| 29 | Duty Free | Duty Free Shopping | Properties and DUFRY | Info provided to DUFY by Airside Prop | Y |
| 30 | Provide ticket and gate counter cores and keys | Facilities | Locks and access; Mike B. | Pending Terminal Management & FAC; rekeyed AIRLINE, Fenix needs new; Ops needs copies when completed | N/A |
| 31 | Smartphone Boarding Pass | FIS Holdroom & Terminal Areas | CBP items/Simran | Pending AIRLINE; Pam | Y |
| 32 | Holdroom seating, traffic flow, etc. | FIS Holdroom & Terminal Areas | Simran | No changes, item can be closed as of 5/26 | Y |
| 33 | 2nd boarding pass scanner at gate | FIS Holdroom & Terminal Areas | CBP items/Simran | Biometrics still needs to be setup with AIRLINE; Jen and Pam. Need to test and scan 15 and 18. | Y |
| 34 | Move in coordination - Landside delivery, parking, etc. | Landside | Already present | Ops confirmed all same as previous Ops. N/A | Y |
| 35 | Bus announcements | Landside | Public Transport /Ground Transport | Pending LS- Marty to contact sign shop to verify bus no change (John for automated voice on bus) | Y |
| 36 | Airline staff parking requirements | Landside | Fenix coordinating with Valerie | Status: SP Plus (AIRLINE employee parking needs agreement) | Y |
| 37 | Website changes | Marketing/Customer Service/Comms | Simran | Terminal waiting for updates from AIRLINE as of 5/26 so we can have the website updated | Y |
| 38 | Visitor Gifts | Marketing/Customer Service/Comms | Contact Marketing if applicable | Marketing responding to all task items separately via email (S.W.) We need Ducks. Ducks confirmed. | Y |
| 39 | SJC Press Distribution List - to Airline | Marketing/Customer Service/Comms | Need to confirm if event | Pending Marketing. As of 5/26, Customer Experience (Vicki) was going to have some ducks and something like cake or Airline balloons for the launch. | Y |
| 40 | Press release - DOT Approval (tickets on sale) | Marketing/Customer Service/Comms | Confirmation pending International agreement | N/A Tickets already on sale. Remind marketing | Y |
| 41 | Organize promotional campaign for Airline | Marketing/Customer Service/Comms | AIRLINE will need to request | Pending Marketing | Y |
| 42 | Organize inaugural flight activities | Marketing/Customer Service/Comms | AIRLINE will need to request | Pending Marketing/Air Service. As of 5/26, Customer Experience (Vicki) has a few things planned (ducks and cake or Airline Balloons) | Y |
| 43 | Media Advisory - DOT Approval (introduce airline to community) | Marketing/Customer Service/Comms | N/A | N/A, not required, Air service will advise | Y |
| 44 | Introductions to business community | Marketing/Customer Service/Comms | N/A | N/A, not required, Air service will advise | Y |
| 45 | Identify any specific language needs | Marketing/Customer Service/Comms | N/A | N/A, not required, Air service will advise | Y |
| 46 | Google indoor mapping | Marketing/Customer Service/Comms | Can occur after launch | N/A, find out who manages this; Vicky may know | Y |
| 47 | Educate Airport/Information Desk volunteers | Marketing/Customer Service/Comms | Fenix contact for Operations number pending | Pending TM | Y |
| 48 | Airline lost and found information | Marketing/Customer Service/Comms | Fenix contact for Operations number pending | Received for AIRLINE | Y |
| 49 | Coordination with CBP/FIS agencies | Miscellaneous | AIRLINE/Fenix processing | Pending AIRLINE | Y |
| 50 | Paging system implementation | Operations | Sim | Ops confirmed existing fine, Fenix/AIRLINE need training, Ops will confirm just before launch. Alex to confirm/training. | Y |
| 51 | BHS Agreement between Airline and TSA | Operations - Security | AIRLINE | Pending Security. AIRLINE to add letter to permit Fenix Airline baggage handling. | Y |
| 52 | Cage Buildout | Planning and Development | N/A | Same as AIRLINE previous; N/A | Y |
| 53 | Wheelchair services | Properties | Fenix to handle | AS of 5/26, 1/2 have been delivered. | Y |
| 54 | Verify number of ticket counters Airline will use | Properties | Ticket Counter | As of 5/26, AIRLINE confirmed 4 ticket counts (41 - 44) | Y |
| 55 | Verify City Business License in Place | Properties | Business License search. | Properties Fenix and AIRLINE done | Y |
| 56 | SmarteCartes - Ensure Appropriate Quantity for Airline | Properties | Need to coordinate ensure no change from last time | N/A. No changes from last time. | Y |
| 57 | Security Deposit and Insurance Certificate | Properties | AIRLINE OA-19 revision:Fenix Waiting on LOC/Waiting on City to identify COI Limits | Pending Properties: Seth had copy, sent to Accounting. AIRLINE onsite; fenix will need to send hard copy once agreement sent for signature. | AIRLINE Y; Fenix N |
| 58 | Return of Environmental Docs | Properties | Fenix Permit/AIRLINE OA | Fenix/Environmental done with Permit; Enviro Q | Y |
| 59 | Provide new entrant package to Airline | Properties | N/A | N/A | Y |
| 60 | Provide assistance with off-Airport office freight needs | Properties | N/A | No need per AIRLINE/Fenix | Y |
| 61 | Property Manager assigned | Properties | 5/3/2021 Martin. 9/21 Seth. 3/22 Martin | N/A TSA Introduction Letter to Scott completed. | Y |
| 62 | Prepare all required billing instructions | Properties | Pending June | Pending Properties | IP |
| 63 | Obtain Executed Lease & Operating Agreement | Properties | AIRLINE Signed | Pending Properties: Dupe See 75 | Y |
| 64 | New Entrant Questionnaire Due from Airline | Properties | N/A for AIRLINE, N/A for Fenix (GH) | N/A | N/A |
| 65 | Identify type (sig) and prepare agreement | Properties | Non-Sig draft pending AIRLINE signature | Pending Properties. OA-19 needs to be executed. | Y |
| 66 | Identify terminal support space requirements | Properties | Same cage, same ramp, less office AIRLINE, Office added Fenix | Pending Properties | Y |
| 67 | Identify improvements, coordinate Form A/B process | Properties | Electrical chargers | Advised no chargers on gates; Ops may allow install on ramp wall; Ian status asked 4/29/22. 5/3/22 | Y |
| 68 | Identify ground handler selected by Airline, prepare permits as needed | Properties | Fenix | Pending Properties; Fenix Permit Completed; pending lease of space | Y |
| 69 | Identify cargo space requirements, prepare lease as needed | Properties | Fenix/AIRLINE | 1) No Cargo required 2) AIRLINE OA Office space. 3) Fenix Lease near Ofc and Ramp | Y |
| 70 | Fueling | Properties | Fueling confirmed by Pam | AIRLINE confirmation with Swissport | Y |
| 71 | Currency exchange/ATMs | Properties | N/A | N/A (ATM is US currency only) | Y |
| 72 | Catering | Properties | Food and Int Trash | Pending AIRLINE contracts | Y |
| 73 | ATO offices requirements | Properties | B1701 selected | Pending AIRLINE Agreement (reduced space) | Y |
| 74 | Assign new mail box | Properties | N/A | Pending Properties; checking what happened to AIRLINE old mail keys | Y |
| 75 | Airline Agreement | Properties | N/A | Draft pending AIRLINE signature; address corrected, AIRLINE signing 6/1/22. Returned 6.6.22 signed. | Y |
| 76 | Adjust concessions hours as required | Properties | Pending | Properties to send info to concessions | Y |
| 77 | Review any Form A/B required for start up | Properties P&D | See item 73 | (Dupe) | N/A |
| 78 | Authorized Signatory Introduction for Airline and Parking | Properties; Security | Jen Authorized; Paperwork submitted and pending approval | Pending Security/LS. Staff half processed. | Y |
| 79 | Update directory signage | Signage | Changes?, If so Zar - Sign Package sent to Airline | N/A; overall redo with Zar discussed. | Y |
| 80 | Ticketing Queue Signage (11x14’s) | Signage | Changes?, If so Zar - Sign Package sent to Airline | Pending Terminal Management coord with Zar for final end of May; all old signage exists. | Y |
| 81 | Signs for Leased Office Space | Signage | Changes?, If so Zar - Sign Package sent to Airline | Pending Properties | Y |
| 82 | Roadway Traffic Sign Revisions | Signage | Changes?, If so Zar - Sign Package sent to Airline | N/A | Y |
| 83 | Curbside Signage | Signage | Changes?, If so Zar - Sign Package sent to Airline | N/A | Y |
| 84 | Courtesy phone numbers | Signage | Same as #7 - See #7 | Pending TM (Dupe?) | Y |
| 85 | Airport provided regulatory signage | Signage | Simran | As of 5/26, pending AIRLINE availability to review | Y |
| 86 | Sterile Corridor and Conflict Training | Training | Simran | As of 5/26, pending AIRLINE availability to train | N/A |
| 87 | Shared use system training | Training | Simran | As of 5/26, pending AIRLINE availability to train | Y |
| 88 | Obtain summary of Airline emergency plan, tarmac delay plan | Training | AIRLINE/Fenix to provide | IPm IAN/Sim. On website | Y |
| 89 | Jet bridge training | Training | Simran/ATEM | As of 5/26, pending AIRLINE availability to train | Y |
| 90 | Issue Airline a copy of the Airport Emergency Plan | Training | Done, per Ian, Operations will reach out to Fenix | Pending Pam has. | Y |
| 91 | Brief airline on arrival/departure delay notifications | Training | They understand notifications. | As of 5/26, pending AIRLINE availability to train | Y |
| 92 | Airline baggage hygiene training | Training | Simran/VI | As of 5/26, pending AIRLINE availability to train | Y |
| 93 | International Trash | Fenix to coordinate | AIRLINE contract | Y | |
| 94 | Pandemic Compliance Docs | Fenix to coordinate | Marty will check what is required. None Required. | N/A | |
| 95 | AIRLINE International docs | AIRLINE to coordinate with DHS | Landing Rights Approved | Y |
This page intentionally left blank.