- assist an engineer or planner with guidance on the steps needed to design for target speed. This guide is anticipated to be published as part of the NCHRP Report series, to facilitate its distribution to a wider audience of practitioners and promote implementation. (b) Final Report that documents the entire project (this document). (c) Prioritized recommendations for future research to guide subsequent research efforts based on findings from this project. (d) Suggested modifications to standard references that will describe, in detail, where the findings from this project may be incorporated into documents such as the AASHTO Green Book (AASHTO 2018), the TRB Highway Capacity Manual (TRB 2016), and other relevant references. These suggested modifications are included in Appendix H. (e) Presentation (Power Point format) with speaker notes that described the project background, objectives, research approach, findings, and conclusions suitable for use in a webinar. (f) Technical memorandum titled “Implementation of Research Findings and Products” that was provided as a standalone document. (g) Webinar that described the activities and findings of the project, as well as recommendations for implementation, to a diverse set of stakeholders. (h) Draft article suitable for publication in TR News.
During the kickoff meeting for NCHRP Project 15-76, the panel identified three topics for consideration in the project and in the Phase I review efforts:
- Current practices and existing guidance on defining, setting, and designing for target speed.
- A broad project development process, to include planning, design, and operations (and the corresponding practitioners within those areas of the profession as the intended audience).
- The location (i.e., roadway, roadside, or non-roadway) of different factors that have an effect on speed.
In accordance with the direction set by the panel, the research team focused the Phase I review efforts on these three topics. Overall, Phase I efforts were grouped into the following broad areas:
- Conduct project management.
- Review literature with an emphasis on speed concepts and definitions of commonly used speed terms, the use of speed in the design process, and identifying factors that influence speed.
- Identify current practices for incorporating target speed into the design process.
- Develop a conceptual data framework.
- Identify potential datasets for operating speed, site characteristics, and other relevant data.
- Develop a proposed analytical approach for Phase II.
The research team met with the panel at the end of Phase I. In addition to approving the research team’s proposed Phase II activities, the panel set the following directions during the Phase I panel meeting: