3.14.7.3 When an insulated conductor is used to bond electrical components and devices, it should show a continuous green colour, with or without a yellow stripe.

4 Operating requirements

4.1 The incinerator system should be designed and constructed for operation with the following conditions:

Maximum combustion chamber flue gas outlet temperature

1,200°C

Minimum combustion chamber flue gas outlet temperature

850°C

Pre-heat temperature of combustion chamber

650°C

For batch-loaded incinerators, there are no pre-heating requirements. However, the incinerator should be so designed that the temperature in the actual combustion space reaches 600°C within 5 min after start.

Pre-purge, before ignition:

at least four air changes in the chamber(s) and stack, but not less than 15 s

Time between restarts:

at least four air changes in the chamber(s) and stack, but not less than 15 s

Post-purge, after shutoff fuel oil:

not less than 15 s after the closing of the fuel oil valve

Incinerator discharge gases:

Minimum 6% O2.

4.2 Outside surfaces of combustion chamber(s) should be shielded from contact such that people in normal work situations are not exposed to extreme heat (20°C above ambient temperature) or direct contact with surface temperatures exceeding 60°C. Examples of alternatives to accomplish this are a double jacket with an air flow in between or an expanded metal jacket.

4.3 Incinerating systems are to be operated with underpressure (negative pressure) in the combustion chamber such that no gases or smoke can leak out to the surrounding areas.

4.4 The incinerator should have warning plates attached in a prominent location on the unit, warning against unauthorized opening of doors to combustion chamber(s) during operation and against overloading the incinerator with garbage.

4.5 The incinerator should have instruction plate(s) attached in a prominent location on the unit that clearly addresses the following:

Suggested Citation: "4 Operating requirements." National Research Council. 1995. Clean Ships, Clean Ports, Clean Oceans: Controlling Garbage and Plastic Wastes at Sea. Washington, DC: The National Academies Press. doi: 10.17226/4769.
Page 301
Next Chapter: 5 Operating controls
Subscribe to Email from the National Academies
Keep up with all of the activities, publications, and events by subscribing to free updates by email.