| Route, direction: | US-280 Westbound |
| Milepost: | Not provided |
| GPS- Lat., Long. (degrees): | 32.6284, -85.2814 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Mar-1993 |
| Date start of LTPP section: | 30-Apr-1991 |
| LTPP monitoring status: | Out-of-study (06/15/2005) |
| Region (code and description): | 3 – Southern |
None provided
| Route, direction: | US-280 Westbound |
| Milepost: | Not provided |
| GPS- Lat., Long. (degrees): | 32.6357, -85.29572 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Mar-1993 |
| Date start of LTPP section: | 30-Apr-1991 |
| LTPP monitoring status: | Out-of-study (06/15/2005) |
| Region (code and description): | 3 – Southern |
04-17-2003 Full-depth and strip patching
| Route, direction: | US-93 Northbound |
| Milepost: | 52.6 |
| GPS- Lat., Long. (degrees): | 35.42608, -114.2802 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Dry No Freeze |
| Date of construction: | 01-Aug-1993 |
| Date start of LTPP section: | 01-Jan-1993 |
| LTPP monitoring status: | Out-of-study (06/01/2006) |
| Region (code and description): | 4 – Western |
05-01-2002 Slurry seal coat
| Route, direction: | US-93 Northbound |
| Milepost: | 52.6 |
| GPS- Lat., Long. (degrees): | 35.41369, -114.27134 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Dry No Freeze |
| Date of construction: | 01-Aug-1993 |
| Date start of LTPP section: | 01-Jan-1993 |
| LTPP monitoring status: | Out-of-study (06/01/2006) |
| Region (code and description): | 4 – Western |
05-01-2002 Slurry seal coat
| Route, direction: | I-10 Eastbound |
| Milepost: | 109 |
| GPS- Lat., Long. (degrees): | 33.44907, -112.72188 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Dry No Freeze |
| Date of construction: | 01-Oct-1993 |
| Date start of LTPP section: | 01-Jan-1993 |
| LTPP monitoring status: | ACTIVE |
| Region (code and description): | 4 – Western |
None provided
| Route, direction: | I-19 Northbound |
| Milepost: | 33 |
| GPS- Lat., Long. (degrees): | 31.76527, -111.03591 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Dry No Freeze |
| Date of construction: | 01-Aug-1976 |
| Date start of LTPP section: | 09-Aug-1988 |
| LTPP monitoring status: | Out-of-study (02/14/2019) |
| Region (code and description): | 4 – Western |
01-01-1989 Surface grinding
05-12-1997 Mill and overlay with AC
06-01-2012 Crack sealing
| Route, direction: | I-19 Southbound |
| Milepost: | 36.2 |
| GPS- Lat., Long. (degrees): | 31.80774, -111.01244 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Dry No Freeze |
| Date of construction: | 01-Aug-1976 |
| Date start of LTPP section: | 08-Aug-1988 |
| LTPP monitoring status: | Out-of-study (02/14/2019) |
| Region (code and description): | 4 – Western |
01-01-1989 Surface grinding and patch potholes
01-01-1991 Patch potholes and surface treatment (single layer)
12-01-1997 AC overlay and mill and overlay with AC
06-01-2012 Crack sealing
| Route, direction: | I-40 Eastbound |
| Milepost: | 107 |
| GPS- Lat., Long. (degrees): | 35.27854, -113.12956 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Dry No Freeze |
| Date of construction: | 01-Jul-1977 |
| Date start of LTPP section: | 16-Jun-1988 |
| LTPP monitoring status: | ACTIVE |
| Region (code and description): | 4 – Western |
01-01-1989 Patch potholes
01-01-1990 Crack sealing and patch potholes
07-01-1994 Patch potholes
03-17-1997 Crack sealing
07-07-1997 Patch potholes
02-03-1998 Fog seal coat
04-01-1999 Mill and overlay with AC
| Route, direction: | I-5 Southbound |
| Milepost: | 48.6 |
| GPS- Lat., Long. (degrees): | 38.23839, -121.43977 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Jun-1979 |
| Date start of LTPP section: | 07-Jul-1988 |
| LTPP monitoring status: | Out-of-study (06/30/2017) |
| Region (code and description): | 4 – Western |
09-01-1996 Transverse joint sealing and lane-shoulder longitudinal joint sealing
04-01-2009 Surface grinding
08-01-2011 AC shoulder replacement
| Route, direction: | US-50 Northbound |
| Milepost: | 75.3 |
| GPS- Lat., Long. (degrees): | 38.6979, -108.02639 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Dry Freeze |
| Date of construction: | 01-Feb-1984 |
| Date start of LTPP section: | 27-Jul-1988 |
| LTPP monitoring status: | Out-of-study (10/25/2018) |
| Region (code and description): | 4 – Western |
06-25-2001 AC shoulder restoration, AC overlay, and heater scarification (surface recycled, AC)
| Route, direction: | State-117 Northbound |
| Milepost: | 3.5 |
| GPS- Lat., Long. (degrees): | 41.3941, -72.02731 |
| Functional class: | Rural Major Collector |
| No. of lanes: | 1 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Jul-1985 |
| Date start of LTPP section: | 01-Jul-1988 |
| LTPP monitoring status: | Out-of-study (08/31/2018) |
| Region (code and description): | 1 – North Atlantic |
01-17-1995 Crack sealing
07-24-1996 Crack sealing
06-20-2000 AC shoulder restoration, AC overlay, and full-depth AC patching
| Route, direction: | US-113 Southbound |
| Milepost: | 25 |
| GPS- Lat., Long. (degrees): | 38.78527, -75.43874 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 05-Oct-1995 |
| Date start of LTPP section: | 01-Jan-1992 |
| LTPP monitoring status: | Out-of-study (05/01/2008) |
| Region (code and description): | 1 – North Atlantic |
09-22-1996 Surface grinding, AC overlay, and full-depth AC patching
| Route, direction: | State-247 Eastbound |
| Milepost: | 1.1 |
| GPS- Lat., Long. (degrees): | 32.61541, -83.69992 |
| Functional class: | Rural Major Collector |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Jun-1986 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (05/21/1999) |
| Region (code and description): | 3 – Southern |
06-15-1990 AC shoulder replacement
| Route, direction: | US-19 Westbound |
| Milepost: | 41.4 |
| GPS- Lat., Long. (degrees): | 34.40356, -84.005 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Jun-1981 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (01/01/2005) |
| Region (code and description): | 3 – Southern |
09-15-1995 Crack sealing
05-31-1997 Surface grinding, surface treatment (single layer)
| Route, direction: | US-23 Southbound |
| Milepost: | 29.7 |
| GPS- Lat., Long. (degrees): | 34.37311, -83.72644 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Dec-1981 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | ACTIVE |
| Region (code and description): | 3 – Southern |
12-15-2010 Transverse joint sealing, lane-shoulder longitudinal joint sealing, and surface grinding
06-01-2018 Lane-shoulder longitudinal joint sealing and PCC slab replacement
| Route, direction: | I-15 Southbound |
| Milepost: | 132 |
| GPS- Lat., Long. (degrees): | 43.68192, -112.11765 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Dry Freeze |
| Date of construction: | 01-Oct-1969 |
| Date start of LTPP section: | 19-Jul-1988 |
| LTPP monitoring status: | Out-of-study (08/01/1997) |
| Region (code and description): | 4 – Western |
03-01-1997 Patch potholes
| Route, direction: | US-41 Southbound |
| Milepost: | 199.4 |
| GPS- Lat., Long. (degrees): | 40.59723, -87.38037 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Aug-1976 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (08/05/2016) |
| Region (code and description): | 2 – North Central |
03-25-1996 Partial depth patching
06-01-2000 Partial depth patching (joints)
06-01-2002 Partial depth patching (joints)
06-01-2004 Partial depth patching (joints)
06-01-2006 Partial depth patching
08-01-2009 Partial depth patching (joints)
06-01-2013 AC shoulder restoration, partial depth patching (non-joints)
07-01-2014 AC shoulder restoration, AC overlay, PCC fracture as base for new AC surface
| Route, direction: | I-70 Westbound |
| Milepost: | 281.6 |
| GPS- Lat., Long. (degrees): | 38.96198, -97.1023 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Dry Freeze |
| Date of construction: | 01-Oct-1985 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (05/01/2007) |
| Region (code and description): | 2 – North Central |
06-01-1997 Partial depth patching (non-joints)
05-01-1998 Full depth patching (non-joints)
05-01-2001 Partial depth patching (joints)
09-01-2003 Partial depth patching (joints & non-joints)
01-18-2006 Crack sealing, transverse and lane-shoulder longitudinal joint sealing, and partial depth patching (joints) and non-joints
| Route, direction: | US-2 Westbound |
| Milepost: | Not provided |
| GPS- Lat., Long. (degrees): | 44.57353 - -70.29562 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 1 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Jul-1973 |
| Date start of LTPP section: | 01-Jul-1988 |
| LTPP monitoring status: | Out-of-study (08/01/2007) |
| Region (code and description): | 1 – North Atlantic |
09-15-1996 AC shoulder restoration and AC overlay
| Route, direction: | State-90 Eastbound |
| Milepost: | 0.2 |
| GPS- Lat., Long. (degrees): | 38.37158, -75.25976 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 1 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Jun-1976 |
| Date start of LTPP section: | 01-Nov-1988 |
| LTPP monitoring status: | Out-of-study (12/13/2016) |
| Region (code and description): | 1 – North Atlantic |
05-05-1998 AC shoulder restoration, AC overlay, and hot mix recycled AC overlay
| Route, direction: | I-391 Northbound |
| Milepost: | 2 |
| GPS- Lat., Long. (degrees): | 42.16538, -72.61086 |
| Functional class: | Urban Principal Arterial – Interstate |
| No. of lanes: | 3 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-May-1982 |
| Date start of LTPP section: | 01-Jun-1988 |
| LTPP monitoring status: | Out-of-study (09/01/2004) |
| Region (code and description): | 1 – North Atlantic |
06-05-1988 Crack sealing
10-14-1992 Crack sealing
09-19-1993 Patch potholes
11-03-1994 Crack sealing
10-01-1996 Crack sealing, and patch potholes
05-01-1997 Manual premix spot patch
07-01-1997 Crack sealing and patch potholes
05-01-2000 Patch potholes
04-01-2002 Patch potholes
| Route, direction: | US-10 Eastbound |
| Milepost: | 140.2 |
| GPS- Lat., Long. (degrees): | 46.02593, -94.42131 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Jan-1979 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (06/01/2011) |
| Region (code and description): | 2 – North Central |
06-15-1993 Patch potholes
08-29-1994 Surface treatment (single layer)
06-22-1995 Mill and overlay with hot mix recycled AC
04-01-2003 Crack sealing
07-25-2003 Aggregate seal coat
| Route, direction: | US-10 Eastbound |
| Milepost: | 58.3 |
| GPS- Lat., Long. (degrees): | 46.67769, -95.67014 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Jan-1972 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (07/13/2001) |
| Region (code and description): | 2 – North Central |
07-23-1997 Mill and overlay with AC
| Route, direction: | US-2 Westbound |
| Milepost: | 173.2 |
| GPS- Lat., Long. (degrees): | 47.3088, -93.7167 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Oct-1979 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (09/01/2009) |
| Region (code and description): | 2 – North Central |
06-01-2001 Partial depth patching (joints)
| Route, direction: | US-2 Westbound |
| Milepost: | 113.8 |
| GPS- Lat., Long. (degrees): | 47.46124, -94.912 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Sep-1981 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (06/01/2018) |
| Region (code and description): | 2 – North Central |
06-22-1998 Mill and overlay with hot mix recycled AC
06-01-2001 Crack sealing
06-01-2015 Crack sealing
06-01-2016 Skin patching
| Route, direction: | State-35 Northbound |
| Milepost: | Not provided |
| GPS- Lat., Long. (degrees): | 33.05531, -89.56852 |
| Functional class: | Urban Other Principal Arterial |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Nov-1986 |
| Date start of LTPP section: | 30-Apr-1987 |
| LTPP monitoring status: | Out-of-study (07/31/1998) |
| Region (code and description): | 3 – Southern |
None provided
| Route, direction: | US-84 Eastbound |
| Milepost: | Not provided |
| GPS- Lat., Long. (degrees): | 31.70185, -89.42216 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Jun-1982 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (06/01/2001) |
| Region (code and description): | 3 – Southern |
05-15-1997 Patch potholes
05-15-1999 Patch potholes
| Route, direction: | I-15 Northbound |
| Milepost: | 266.5 |
| GPS- Lat., Long. (degrees): | 47.39796, -111.55324 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Dry Freeze |
| Date of construction: | 01-Oct-1998 |
| Date start of LTPP section: | 18-Sep-1997 |
| LTPP monitoring status: | Out-of-study (05/01/2017) |
| Region (code and description): | 4 – Western |
06-01-2003 Crack sealing
07-24-2004 Aggregate seal coat
05-02-2007 Crack sealing
08-01-2008 Crack sealing
07-06-2016 Aggregate seal coat and mill and overlay with AC
| Route, direction: | US-12 Eastbound |
| Milepost: | 137 |
| GPS- Lat., Long. (degrees): | 46.30759, -109.12174 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 1 |
| Climatic zone: | Dry Freeze |
| Date of construction: | 01-Jun-1988 |
| Date start of LTPP section: | 31-May-1988 |
| LTPP monitoring status: | ACTIVE |
| Region (code and description): | 4 – Western |
06-01-2003 AC shoulder replacement, AC overlay, and aggregate seal coat
06-15-2013 Crack sealing
| Route, direction: | US-81 Southbound |
| Milepost: | 4.1 |
| GPS- Lat., Long. (degrees): | 40.05753, -97.61428 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Dry Freeze |
| Date of construction: | 01-Jul-1995 |
| Date start of LTPP section: | 01-Jan-1995 |
| LTPP monitoring status: | Out-of-study (09/27/2002) |
| Region (code and description): | 2 – North Central |
07-12-2000 Surface grinding
| Route, direction: | I-80 Westbound |
| Milepost: | 274.5 |
| GPS- Lat., Long. (degrees): | 40.66998, -99.04936 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Dry Freeze |
| Date of construction: | 01-May-1985 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (08/01/2004) |
| Region (code and description): | 2 – North Central |
06-01-2000 Transverse joint sealing and lane-shoulder longitudinal joint sealing
| Route, direction: | I-80 Eastbound |
| Milepost: | 178.7 |
| GPS- Lat., Long. (degrees): | 40.69259, -117.00224 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Dry Freeze |
| Date of construction: | 01-Aug-1995 |
| Date start of LTPP section: | 01-Jan-1993 |
| LTPP monitoring status: | Out-of-study (07/01/2009) |
| Region (code and description): | 4 – Western |
05-01-2002 Crack sealing
04-01-2009 Patch potholes
| Route, direction: | I-80 Eastbound |
| Milepost: | 177.2 |
| GPS- Lat., Long. (degrees): | 40.70487, -117.01792 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Dry Freeze |
| Date of construction: | 01-Aug-1995 |
| Date start of LTPP section: | 01-Jan-1993 |
| LTPP monitoring status: | Out-of-study (01/01/2004) |
| Region (code and description): | 4 – Western |
10-01-1995 Partial depth patching (non-joints)
05-01-1996 Partial depth patching (non-joints)
05-01-1997 Crack sealing and partial depth patching (joints)
09-15-1997 Crack sealing
| Route, direction: | I-393 Eastbound |
| Milepost: | 1.1 |
| GPS- Lat., Long. (degrees): | 43.22241, -71.51287 |
| Functional class: | Urban Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Jan-1981 |
| Date start of LTPP section: | 01-Aug-1988 |
| LTPP monitoring status: | Out-of-study (04/01/2017) |
| Region (code and description): | 1 – North Atlantic |
08-01-2001 Full-depth AC patching
04-15-2002 Full-depth AC patching
09-01-2003 Mill and overlay with AC
08-01-2007 Crack sealing
07-15-2009 Aggregate seal coat
07-01-2016 AC overlay
| Route, direction: | I-195 Westbound |
| Milepost: | 11.4 |
| GPS- Lat., Long. (degrees): | 40.18213, -74.55898 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Nov-1968 |
| Date start of LTPP section: | 01-Nov-1991 |
| LTPP monitoring status: | Out-of-study (12/31/2004) |
| Region (code and description): | 1 – North Atlantic |
06-01-1997 Patch potholes
09-08-1999 Full-depth AC patching
06-01-2001 Manual premix spot patch
| Route, direction: | I-195 Westbound |
| Milepost: | 11.4 |
| GPS- Lat., Long. (degrees): | 40.1772, -74.54224 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Nov-1968 |
| Date start of LTPP section: | 01-Nov-1991 |
| LTPP monitoring status: | Out-of-study (04/01/2010) |
| Region (code and description): | 1 – North Atlantic |
08-18-1992 AC shoulder restoration and hot mix recycled AC overlay
06-01-2001 Patch potholes – Hand Spread, Compacted with Truck
06-01-2003 22-Manual Premix Spot Patch (hand spreading and compacting with roller)
| Route, direction: | I-195 Westbound |
| Milepost: | 11.4 |
| GPS- Lat., Long. (degrees): | 40.17666, -74.52877 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Nov-1968 |
| Date start of LTPP section: | 01-Nov-1991 |
| LTPP monitoring status: | Out-of-study (04/01/2010) |
| Region (code and description): | 1 – North Atlantic |
07-27-1992 AC shoulder restoration and hot mix recycled AC overlay
| Route, direction: | I-195 Westbound |
| Milepost: | 11.4 |
| GPS- Lat., Long. (degrees): | 40.1801, -74.55302 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Nov-1968 |
| Date start of LTPP section: | 01-Nov-1991 |
| LTPP monitoring status: | Out-of-study (04/01/2010) |
| Region (code and description): | 1 – North Atlantic |
07-28-1992 AC shoulder restoration and AC overlay
| Route, direction: | I-195 Westbound |
| Milepost: | 11.4 |
| GPS- Lat., Long. (degrees): | 40.181, -74.55566 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Nov-1968 |
| Date start of LTPP section: | 01-Nov-1991 |
| LTPP monitoring status: | Out-of-study (04/01/2010) |
| Region (code and description): | 1 – North Atlantic |
07-20-1992 AC shoulder restoration and AC overlay
| Route, direction: | I-195 Westbound |
| Milepost: | 11.4 |
| GPS- Lat., Long. (degrees): | 40.17696, -74.53791 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Nov-1968 |
| Date start of LTPP section: | 01-Nov-1991 |
| LTPP monitoring status: | Out-of-study (04/01/2010) |
| Region (code and description): | 1 – North Atlantic |
07-20-1992 AC shoulder restoration and mill and overlay with AC
| Route, direction: | I-195 Westbound |
| Milepost: | 11.4 |
| GPS- Lat., Long. (degrees): | 40.1778, -74.51911 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Nov-1968 |
| Date start of LTPP section: | 01-Nov-1991 |
| LTPP monitoring status: | Out-of-study (04/01/2010) |
| Region (code and description): | 1 – North Atlantic |
07-20-1992 AC shoulder restoration and mill and overlay with AC
| Route, direction: | I-195 Westbound |
| Milepost: | 11.4 |
| GPS- Lat., Long. (degrees): | 40.17667, -74.5313 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Nov-1968 |
| Date start of LTPP section: | 01-Nov-1991 |
| LTPP monitoring status: | Out-of-study (04/01/2010) |
| Region (code and description): | 1 – North Atlantic |
07-20-1992 AC shoulder restoration and mill and overlay with hot mix recycled AC
| Route, direction: | I-195 Westbound |
| Milepost: | 11.4 |
| GPS- Lat., Long. (degrees): | 40.17686, -74.53579 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Nov-1968 |
| Date start of LTPP section: | 01-Nov-1991 |
| LTPP monitoring status: | Out-of-study (04/01/2010) |
| Region (code and description): | 1 – North Atlantic |
07-20-1992 AC shoulder restoration and mill and overlay with hot mix recycled AC
| Route, direction: | I-195 Westbound |
| Milepost: | 11.4 |
| GPS- Lat., Long. (degrees): | 40.1792, -74.55032 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Nov-1968 |
| Date start of LTPP section: | 01-Nov-1991 |
| LTPP monitoring status: | Out-of-study (04/01/2010) |
| Region (code and description): | 1 – North Atlantic |
07-20-1992 AC shoulder restoration and mill and overlay with hot mix recycled AC
| Route, direction: | I-195 Westbound |
| Milepost: | 11.4 |
| GPS- Lat., Long. (degrees): | 40.17842, -74.54815 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Nov-1968 |
| Date start of LTPP section: | 01-Nov-1991 |
| LTPP monitoring status: | Out-of-study (04/01/2010) |
| Region (code and description): | 1 – North Atlantic |
07-20-1992 AC shoulder restoration and mill and overlay with AC
| Route, direction: | I-195 Eastbound |
| Milepost: | 9.5 |
| GPS- Lat., Long. (degrees): | 40.17842, -74.549 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Mar-1970 |
| Date start of LTPP section: | 01-Oct-1992 |
| LTPP monitoring status: | Out-of-study (04/01/2010) |
| Region (code and description): | 1 – North Atlantic |
04-22-1998 Mill and overlay with AC
| Route, direction: | I-195 Eastbound |
| Milepost: | 9.5 |
| GPS- Lat., Long. (degrees): | 40.17629, -74.53155 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Mar-1970 |
| Date start of LTPP section: | 01-Oct-1992 |
| LTPP monitoring status: | Out-of-study (04/01/2010) |
| Region (code and description): | 1 – North Atlantic |
04-22-1998 Mill and overlay with AC
| Route, direction: | I-195 Eastbound |
| Milepost: | 9.5 |
| GPS- Lat., Long. (degrees): | 40.17721, -74.54459 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Mar-1970 |
| Date start of LTPP section: | 01-Oct-1992 |
| LTPP monitoring status: | Out-of-study (04/01/2010) |
| Region (code and description): | 1 – North Atlantic |
04-22-1998 Mill and overlay with AC
06-01-2002 Manual premix spot patch
| Route, direction: | I-195 Eastbound |
| Milepost: | 9.5 |
| GPS- Lat., Long. (degrees): | 40.17648, -74.52695 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Mar-1970 |
| Date start of LTPP section: | 01-Oct-1992 |
| LTPP monitoring status: | Out-of-study (04/01/2010) |
| Region (code and description): | 1 – North Atlantic |
04-22-1998 Mill and overlay with AC
| Route, direction: | I-195 Eastbound |
| Milepost: | 9.5 |
| GPS- Lat., Long. (degrees): | 40.1771, -74.52235 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Mar-1970 |
| Date start of LTPP section: | 01-Oct-1992 |
| LTPP monitoring status: | Out-of-study (04/01/2010) |
| Region (code and description): | 1 – North Atlantic |
04-22-1998 Mill and overlay with AC
| Route, direction: | I-195 Eastbound |
| Milepost: | 9.5 |
| GPS- Lat., Long. (degrees): | 40.17759, -74.51768 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Mar-1970 |
| Date start of LTPP section: | 01-Oct-1992 |
| LTPP monitoring status: | Out-of-study (04/01/2010) |
| Region (code and description): | 1 – North Atlantic |
04-22-1998 Mill and overlay with AC
| Route, direction: | US-62 Eastbound |
| Milepost: | 81.3 |
| GPS- Lat., Long. (degrees): | 32.63344, -103.51941 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Dry No Freeze |
| Date of construction: | 01-Jun-1984 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (12/01/2004) |
| Region (code and description): | 3 – Southern |
None provided
| Route, direction: | I-88 Eastbound |
| Milepost: | 46.1 |
| GPS- Lat., Long. (degrees): | 42.37762, -75.19142 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Jun-1974 |
| Date start of LTPP section: | 01-Jun-1988 |
| LTPP monitoring status: | Out-of-study (05/01/2010) |
| Region (code and description): | 1 – North Atlantic |
07-01-1990 Partial depth patching (non-joints)
07-07-1993 AC shoulder restoration and longitudinal subdrains
09-08-1993 Transverse joint sealing and lane-shoulder longitudinal joint sealing
07-11-1994 Transverse joint sealing and lane-shoulder longitudinal joint sealing
09-01-1994 Partial depth patching (non-joints)
08-01-1996 Partial depth patching (non-joints)
09-29-1999 Partial depth patching (non-joints)
06-01-2007 Patch potholes
| Route, direction: | State-947A Eastbound |
| Milepost: | 103.5 |
| GPS- Lat., Long. (degrees): | 43.35528, -77.92666 |
| Functional class: | Rural Minor Arterial |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Aug-1994 |
| Date start of LTPP section: | 01-Jun-1994 |
| LTPP monitoring status: | Out-of-study (10/15/2008) |
| Region (code and description): | 1 – North Atlantic |
None provided
| Route, direction: | US-52 Southbound |
| Milepost: | 91.5 |
| GPS- Lat., Long. (degrees): | 35.86431, -80.26884 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Jul-1994 |
| Date start of LTPP section: | 15-Jul-1992 |
| LTPP monitoring status: | Out-of-study (12/31/2003) |
| Region (code and description): | 1 – North Atlantic |
None provided
| Route, direction: | US-52 Southbound |
| Milepost: | 91.5 |
| GPS- Lat., Long. (degrees): | 35.8606, -80.26781 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Jul-1994 |
| Date start of LTPP section: | 15-Jul-1992 |
| LTPP monitoring status: | Out-of-study (12/31/2003) |
| Region (code and description): | 1 – North Atlantic |
None provided
| Route, direction: | US-52 Southbound |
| Milepost: | 91.5 |
| GPS- Lat., Long. (degrees): | 35.84388, -80.28166 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Jul-1994 |
| Date start of LTPP section: | 15-Jul-1992 |
| LTPP monitoring status: | ACTIVE |
| Region (code and description): | 1 – North Atlantic |
None provided
| Route, direction: | US-52 Southbound |
| Milepost: | 91.5 |
| GPS- Lat., Long. (degrees): | 35.84568, -80.28074 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Jul-1994 |
| Date start of LTPP section: | 15-Jul-1992 |
| LTPP monitoring status: | ACTIVE |
| Region (code and description): | 1 – North Atlantic |
06-01-2015 Patch potholes
| Route, direction: | US-17 Northbound |
| Milepost: | 275.9 |
| GPS- Lat., Long. (degrees): | 36.52984, -76.36623 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-May-1982 |
| Date start of LTPP section: | 01-Nov-1988 |
| LTPP monitoring status: | Out-of-study (05/15/2017) |
| Region (code and description): | 1 – North Atlantic |
09-01-2002 Mill and overlay with AC
| Route, direction: | US-23 Northbound |
| Milepost: | 17.8 |
| GPS- Lat., Long. (degrees): | 40.38467, -83.07379 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Sep-1996 |
| Date start of LTPP section: | 01-Jan-1994 |
| LTPP monitoring status: | Out-of-study (02/16/2007) |
| Region (code and description): | 2 – North Central |
None provided
| Route, direction: | US-23 Southbound |
| Milepost: | 18.7 |
| GPS- Lat., Long. (degrees): | 40.38686, -83.07403 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 31-Dec-1995 |
| Date start of LTPP section: | 01-Jan-1994 |
| LTPP monitoring status: | Out-of-study (05/15/2017) |
| Region (code and description): | 2 – North Central |
04-01-2011 Mill and overlay with AC
06-01-2012 AC shoulder restoration, Mill and overlay with hot mix recycled AC
| Route, direction: | US-60 Westbound |
| Milepost: | 8.4 |
| GPS- Lat., Long. (degrees): | 36.39117, -98.2855 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 1 |
| Climatic zone: | Wet No-Freeze |
| Date of construction: | 01-Jun-1984 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (12/07/2007) |
| Region (code and description): | 3 – Southern |
None provided
| Route, direction: | I-99 Northbound |
| Milepost: | 12.4 |
| GPS- Lat., Long. (degrees): | 40.22314, -78.46901 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Sep-1977 |
| Date start of LTPP section: | 01-Sep-1988 |
| LTPP monitoring status: | Out-of-study (08/01/2016) |
| Region (code and description): | 1 – North Atlantic |
05-01-2002 AC shoulder restoration
10-01-2002 AC shoulder restoration
06-01-2008 AC shoulder restoration, AC overlay, lane-shoulder longitudinal joint sealing, and saw and seal
| Route, direction: | State-1804 Southbound |
| Milepost: | 400.1 |
| GPS- Lat., Long. (degrees): | 45.92797, -100.40881 |
| Functional class: | Rural Major Collector |
| No. of lanes: | 1 |
| Climatic zone: | Dry Freeze |
| Date of construction: | 01-Jun-1993 |
| Date start of LTPP section: | 01-Jan-1992 |
| LTPP monitoring status: | Out-of-study (04/01/2017) |
| Region (code and description): | 2 – North Central |
06-01-2014 AC overlay
| Route, direction: | I-29 Southbound |
| Milepost: | 229.2 |
| GPS- Lat., Long. (degrees): | 45.61894, -96.98969 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Dry Freeze |
| Date of construction: | 01-Sep-1983 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (06/01/2018) |
| Region (code and description): | 2 – North Central |
06-01-1999 Surface grinding
| Route, direction: | State-73 Southbound |
| Milepost: | 156.9 |
| GPS- Lat., Long. (degrees): | 44.77179, -102.05531 |
| Functional class: | Rural Minor Arterial |
| No. of lanes: | 1 |
| Climatic zone: | Dry Freeze |
| Date of construction: | 01-May-1989 |
| Date start of LTPP section: | 01-May-1989 |
| LTPP monitoring status: | Out-of-study (12/31/1997) |
| Region (code and description): | 2 – North Central |
06-13-1991 Crack sealing
07-31-1992 Aggregate seal coat
| Route, direction: | US-77 Northbound |
| Milepost: | 2 |
| GPS- Lat., Long. (degrees): | 28.51027, -97.05801 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Mar-1986 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (08/01/2000) |
| Region (code and description): | 3 – Southern |
None provided
| Route, direction: | State-19 Northbound |
| Milepost: | 5.6 |
| GPS- Lat., Long. (degrees): | 33.50472, -95.58941 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Mar-1987 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (12/15/2005) |
| Region (code and description): | 3 – Southern |
10-14-1992 Fog seal coat
08-14-1993 tack coat
07-27-1999 Aggregate seal coat
11-01-2000 Surface grinding, AC overlay, and aggregate seal coat
08-16-2004 Fog seal coat
| Route, direction: | US-287 Southbound |
| Milepost: | Not provided |
| GPS- Lat., Long. (degrees): | 34.53843, -100.43508 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Jan-1982 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (10/01/1999) |
| Region (code and description): | 3 – Southern |
11-16-1992 Fog seal coat
10-15-1997 Mechanical premix patch
| Route, direction: | US-181 Northbound |
| Milepost: | Not provided |
| GPS- Lat., Long. (degrees): | 29.23594, -98.25362 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Feb-1974 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (06/15/2005) |
| Region (code and description): | 3 – Southern |
07-15-2002 Aggregate seal coat
| Route, direction: | US-77 Northbound |
| Milepost: | 20 |
| GPS- Lat., Long. (degrees): | 26.98349, -97.79512 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-May-1982 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (04/01/2006) |
| Region (code and description): | 3 – Southern |
09-26-1994 Aggregate seal coat
01-30-1995 Fog seal coat
01-15-2001 Surface grinding and manual premix spot patch
| Route, direction: | US-96 Northbound |
| Milepost: | Not provided |
| GPS- Lat., Long. (degrees): | 31.02866, -93.97791 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Sep-1976 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (08/22/2016) |
| Region (code and description): | 3 – Southern |
08-16-2010 Full depth transverse joint repair patch
| Route, direction: | US-90 Eastbound |
| Milepost: | |
| GPS- Lat., Long. (degrees): | 30.0426, -94.37099 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Oct-1970 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (08/24/2016) |
| Region (code and description): | 3 – Southern |
None provided
| Route, direction: | US-191 Northbound |
| Milepost: | 23.7 |
| GPS- Lat., Long. (degrees): | 37.27669, -109.58454 |
| Functional class: | Rural Minor Arterial |
| No. of lanes: | 1 |
| Climatic zone: | Dry Freeze |
| Date of construction: | 01-Nov-1980 |
| Date start of LTPP section: | 04-Apr-1989 |
| LTPP monitoring status: | Out-of-study (06/30/2017) |
| Region (code and description): | 4 – Western |
09-04-1996 Aggregate seal coat
08-01-2003 Aggregate seal coat
06-01-2013 Crack sealing
08-01-2014 Surface treatment (double layer)
| Route, direction: | I-15 Northbound |
| Milepost: | 221.2 |
| GPS- Lat., Long. (degrees): | 39.66702, -111.86489 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Dry Freeze |
| Date of construction: | 01-May-1986 |
| Date start of LTPP section: | 05-Apr-1989 |
| LTPP monitoring status: | Out-of-study (09/26/2018) |
| Region (code and description): | 4 – Western |
08-01-1996 Transverse joint sealing and lane-shoulder longitudinal joint sealing
05-01-2012 Surface grinding, transverse joint sealing, joint load transfer restoration, and partial depth patching (joints)
| Route, direction: | US-7 Northbound |
| Milepost: | 5.1 |
| GPS- Lat., Long. (degrees): | 44.11961, -73.17939 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 1 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Aug-1984 |
| Date start of LTPP section: | 01-Aug-1988 |
| LTPP monitoring status: | Out-of-study (12/31/2005) |
| Region (code and description): | 1 – North Atlantic |
None provided
| Route, direction: | State-29 Southbound |
| Milepost: | 12.6 |
| GPS- Lat., Long. (degrees): | 36.62313, -79.36509 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 1 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Nov-1995 |
| Date start of LTPP section: | 26-Jul-1991 |
| LTPP monitoring status: | Out-of-study (10/01/2001) |
| Region (code and description): | 1 – North Atlantic |
06-01-2001 Patch potholes
| Route, direction: | State-29 Southbound |
| Milepost: | 12.6 |
| GPS- Lat., Long. (degrees): | 36.65877, -79.36539 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 1 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Nov-1995 |
| Date start of LTPP section: | 26-Jul-1991 |
| LTPP monitoring status: | Out-of-study (11/02/2018) |
| Region (code and description): | 1 – North Atlantic |
10-01-2004 Strip patching
06-01-2011 AC shoulder restoration and hot mix recycled AC overlay
| Route, direction: | State-14 Westbound |
| Milepost: | 11 |
| GPS- Lat., Long. (degrees): | 45.581, -122.45619 |
| Functional class: | Urban Other Principal Arterial |
| No. of lanes: | 2 |
| Climatic zone: | Wet No Freeze |
| Date of construction: | 01-Aug-1966 |
| Date start of LTPP section: | 22-Aug-1988 |
| LTPP monitoring status: | Out-of-study (05/01/2005) |
| Region (code and description): | 4 – Western |
05-01-2002 AC overlay
| Route, direction: | US-14 Eastbound |
| Milepost: | 60 |
| GPS- Lat., Long. (degrees): | 44.50285, -108.9188 |
| Functional class: | Rural Minor Arterial |
| No. of lanes: | 1 |
| Climatic zone: | Dry Freeze |
| Date of construction: | 01-Jul-1980 |
| Date start of LTPP section: | 17-Aug-1988 |
| LTPP monitoring status: | Out-of-study (10/01/2007) |
| Region (code and description): | 4 – Western |
06-01-1990 Crack sealing
04-01-1998 Aggregate seal coat
09-01-1999 Surface treatment (single layer)
| Route, direction: | Provincial-1 Westbound |
| Milepost: | Not provided |
| GPS- Lat., Long. (degrees): | 49.76956, -100.54064 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Jan-1984 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (11/01/2005) |
| Region (code and description): | 2 – North Central |
06-15-1995 Skin patching
10-01-1996 Skin patching
05-01-2000 Skin patching
07-31-2001 Skin patching
| Route, direction: | Provincial-75 Northbound |
| Milepost: | |
| GPS- Lat., Long. (degrees): | 49.6275, -97.13819 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Sep-1985 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (09/01/2006) |
| Region (code and description): | 2 – North Central |
08-13-1997 254-2-Transverse Joint Sealing, Partial depth patching (joints),
09-01-2000 AC overlay
| Route, direction: | Provincial-11 Northbound |
| Milepost: | 195.5 |
| GPS- Lat., Long. (degrees): | 45.11172, -79.31039 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Jun-1976 |
| Date start of LTPP section: | 01-Oct-1988 |
| LTPP monitoring status: | Out-of-study (08/01/2016) |
| Region (code and description): | 1 – North Atlantic |
07-15-1998 Mill and overlay with hot mix recycled AC
| Route, direction: | Provincial-40 Westbound |
| Milepost: | 221.6 |
| GPS- Lat., Long. (degrees): | 46.47318, -72.35417 |
| Functional class: | Rural Principal Arterial – Interstate |
| No. of lanes: | 2 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Sep-1984 |
| Date start of LTPP section: | 01-Jul-1988 |
| LTPP monitoring status: | Out-of-study (05/24/2017) |
| Region (code and description): | 1 – North Atlantic |
09-02-1992 Partial depth patching
06-01-1994 Partial depth patching
09-05-1994 Partial depth patching
05-01-1996 AC shoulder replacement and partial depth patching (non-joints),
05-01-1997 Partial depth patching
06-01-1998 Partial depth patching
06-20-1999 Crack sealing and partial depth patching (joints),
07-01-2001 Partial depth patching (joints)
10-26-2001 Hot mix recycled AC overlay and partial depth patching (non-joints)
08-25-2003 PCC fracture treatment as base for new Mill and overlay with AC
| Route, direction: | Provincial-16 Eastbound |
| Milepost: | 7.4 |
| GPS- Lat., Long. (degrees): | 51.90253, -105.3077 |
| Functional class: | Rural Principal Arterial – Other |
| No. of lanes: | 1 |
| Climatic zone: | Wet Freeze |
| Date of construction: | 01-Oct-1969 |
| Date start of LTPP section: | 01-Jan-1987 |
| LTPP monitoring status: | Out-of-study (04/01/2008) |
| Region (code and description): | 2 – North Central |
05-27-1995 Patch potholes
06-01-1997 Manual premix spot patch
09-01-1997 Skin patching
10-07-1999 AC overlay
09-16-2002 Crack sealing